background image

GR

-

UM

-

201

-

A

-

04

GR

-

UM

-

201

-

A

-

0

PV+

PV-

1

2

3.3.2 Plug in PV terminal

Note:
1.Before  installing  the  PV  terminal,  please 
double-check  that  the  PV  input  voltage  and 
current do not exceed the MPPT limits.
2.When  installing  the  PV  terminal,  pay 
attention  to  the  difference  between  the 
positive and negative poles and the one-to-
one correspondence between the terminals 
and the machine.
3.There is a "click" sound when the terminal 
is  connected,please  gently  pulling  the  PV 
wire  to  make  sure  there  is  no  loose  or 
pulling off.

3.3.3 Communication cable installation

Click

Click

Download
Manual

Growatt New Energy

5.

Post-installation check

No.

Acceptance criteria

No.

Acceptance criteria

1

The inverter is installed correctly, firmly and reliably.

6

The RS485 communication cable is installed correctly and firmly.

2

The ground wire connected well and the connection is firm 
and reliable.

7

The cable tie port is trimmed well without leaving sharp 
corners,meets the requirements of the user. 

3

All switches are in the OFF state.

8

All exposed terminals are well protected and there are no vacant 
ports.

4

All wiring is correct and securely connected.

9

Pay attention to clean up all construction residues.

5

The wiring of the cable is reasonable, meets the 
requirements, and there is no phenomenon of broken skin.

Connecting Meter

4.

The following table describes how we can connect EASTRON meter (TPM-E)to inverter:

Meter Pin NO. Description

Meter Connection

1/2/3/4

5/6/7/8

A

B

L1/L2/L3/N-in

L1/L2/L3/
N-out

RS485A

RS485B

Grid L1/L2/L3/N

AC connector & Load L1/L2/L3/N

SYS COM Pin 7 RS485A2

SYS COM Pin 8 RS485B2

L1

L2

L3

N

L1

L2

L3

N

1

2

3

4

L1

L2

L3

N

5

6

7

8

B   A

Customer

 

can

 

read

 

more

 

information

 

by push button.

Mark

Describe

Explain

Touch mark

Single touch

Switch the display interface or the 

current number plus 1

Double touch

Enter the setting state or confirm

Triple touch

Return to the previous display 

interface

Long press for 5s

The current data returns to the 

default value

Inverter status indicator

Red

Fault

Green

Normal operation

Red light flashing

Warning

It can display the basic information of inverter through LCD display 
screen (PV/AC voltage,PV power,AC current,total power,generating 
capacity, etc.).

Shenzhen Growatt New Energy CO.,LTD

4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Guxing Community,Xixiang Subdistrict,
Bao’an District, Shenzhen, China

 +86 0755 2747 1942

www.ginverter.com

T
E    

[email protected]

W

7.

Status of PV grid inverter

9.

Service and contact

Note:

6.

Power on and off steps

8.

Export limitation setting

Exporlimit
OFF    

 ON

Password
123

Set parameter

  General

Advanced

Meter

   CT

ExportLimit Rate
     XXX.X%

Set OK

If the local grid company requires to limit the 
output power from your inverter systems,we 
introduce the concept of Export Limit Rate.The 
ratio of your system output power divided by 
the rated power of the inverter is called Export 
Limited Rate.For example,if the local grid 
companyonly accepts 4kW from your 5kW 
system,then the Export Limit Rate of 5kW 
inverter should be 80%.

Inverter side

Click!

Click!

No

.

Description

Remarks

1

+12V

Dry junction : external 
relay coil interface, 
power is not more than 
2W

2

COM

3

RS485A1

RS485 communication 
port

4

RS485B1

5

RS485A2

BAT communication 
port(reserved)

6

RS485B2

7

RS485A3

Meter communication 
port

8

RS485B3

9

DRM1/5

Relay contact 1 input

10

DRM2/6

Relay contact 2 input

11

DRM3/7

Relay contact 3 input

12

DRM4/8

Relay contact 4 input

13

REF/GEN

GND

14

DRM0/COM

/

No

.

RRCR 

Description

Active 
Power

9

K1-out

0

%

10

K2-out

30%

11

K3-out

60%

12

K4-out

100%

13

Relays 
common node

/

14

/

/

When

 

connecting the communication line,port 15 and 16 are not connected,as for the other function,please refer to the above table

according to the customer needs.

Note

connect
to RRCR

Before

 

turning

 

the

 

inverter

 

on

please

 

make

 

sure

 

the

 

PV

 

input

 

voltage

 

and

 

current

 

are

 

within

 

the

 

MPPT

 

limits

Follow

 

the

 

steps

 

below

 

to

 

turn

 

the

 

inverter

 

on

:

1

.

Switch

 

on

 

the

 

build

-

in

 

DC

 

isolator

 

at

 

the

 

bottom

 

of

 

the

 

inverter

.

2

.

Switch

 

on

 

the

 

PV

 

Array

 

and

 

DC

 

isolator

 

next

 

to

 

your

 

inverter

if

 

you

 

can

 

not

 

find

 

this

 

switch

skip

 

this

 

step

.

3

.

Switch

 

on

 

the

 

Solar

 

AC

 

isolator

 

if

 

the

 

inverter

 

is

 

more

 

than

 

3

 

meters

 

away

 

from

 

your

 

switchboard

.

4

.

Switch

 

on

 

the

 

solar

 

supply

 

main

 

switch

 

in

 

the

 

switch

 

board

.

Reviews: