![Growatt GBLI 6531 Manual Download Page 14](http://html1.mh-extra.com/html/growatt/gbli-6531/gbli-6531_manual_2270432014.webp)
Installation
13
Step 2
Fix bracket to wall.
Choose alloy drill bit with a diameter of 12mm
and install it to a drill. Drill in the four spots that
have been located in step 1 and have at least
60mm drilling depth. Clean the soil and drive
expansion tube into the hole. One person puts the
bracket on wall and minds to keep gradienter
horizontal. The other person drives M8 screw
through the bracket into hole.
Step 3
Fix battery on bracket.
Rotate the left latch leftward and the
right latch rightward until they keep
perpendicular to the battery. Install
battery from the top down and lock the
connection part of battery with the
support plate of bracket.
Step 4
Insert power cable and network cable into
battery terminals.
Having confirmed fixed installation, plug
power cables into battery terminals (orange
positive terminal and black negative terminal).
Plug CAN network cable into the network
ports of PCS and battery. Please refer to
Section 4.2 for network making details.
Rotate the left latch rightward until the notch locks
limiting pin, rotate the right latch leftward until the
notch locks limiting pin too.
Leave a minimum clearance of 133mm before the front surface of battery.
In order to guarantee a stable connection between battery and bracket,
please visually check if the two upper joints are fixed. Try to move the
lower part of battery away from wall. The connection is proved qualified
if the battery cannot be moved at all. Otherwise, please connect the
battery and bracket again until confirming a fixed connection.