background image

Installation 

 

13 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 2

 Fix bracket to wall. 

Choose alloy drill bit with a diameter of 12mm 

and install it to a drill. Drill in the four spots that 

have been located in step 1 and have at least 

60mm drilling depth. Clean the soil and drive 

expansion tube into the hole. One person puts the 

bracket on wall and minds to keep gradienter 

horizontal. The other person drives M8 screw 

through the bracket into hole. 

 

Step 3 

Fix battery on bracket. 

Rotate the left latch leftward and the 

right latch rightward until they keep 

perpendicular to the battery. Install 

battery from the top down and lock the 

connection part of battery with the 

support plate of bracket.   

 

Step 4 

Insert power cable and network cable into 

battery terminals. 

Having confirmed fixed installation, plug 

power cables into battery terminals (orange 

positive terminal and black negative terminal). 

Plug CAN network cable into the network 

ports of PCS and battery. Please refer to 

Section 4.2 for network making details. 

Rotate the left latch rightward until the notch locks 

limiting pin, rotate the right latch leftward until the 

notch locks limiting pin too. 

 

Leave a minimum clearance of 133mm before the front surface of battery. 

In order to guarantee a stable connection between battery and bracket, 

please visually check if the two upper joints are fixed. Try to move the 

lower part of battery away from wall. The connection is proved qualified 

if the battery cannot be moved at all. Otherwise, please connect the 

battery and bracket again until confirming a fixed connection. 

 

 

Summary of Contents for GBLI 6531

Page 1: ...0 6 5kWh Residential Energy Storage Battery Manual Version 1 1 Date 2019 08 07...

Page 2: ...ensure that you are familiar with product features functions and safety precautions as provided in this document Warning and caution messages are listed in the document to remind users installers and...

Page 3: ...n Requirements 10 3 2 Installation Required Tools 11 3 3 installation Procedures 11 3 3 1 Wall Mounted Installation 12 3 3 2 Floor Standing Installation 14 4 Electrical Connection 15 4 1 Preparation 1...

Page 4: ...le Certification in European Union area Risk of electric shock Explosive gas Battery may leak corrosive electrolyte Battery is heavy enough to cause severe injury Keep battery away from children Do no...

Page 5: ...wet hands Keep battery away from children and animals A battery can present a risk of electric shock and burns by high short circuited current Battery installation and wire connection must be operate...

Page 6: ...not put battery upside down or sidelong Store batteries in a place free from direct sunlight and rain Keep batteries at least two meters away from a heat source such as a radiator Avoid contacting wi...

Page 7: ...s to power off battery During transportation put battery flat do not have battery stand or lean on the floor to avoid possible crash Maintain temperature between 20 to 45 during the transportation Pro...

Page 8: ...cycle life and less self discharging loss The build in BMS can monitor battery operation status and alarm timely to avoid operation out of limit Two batteries can be parallel connected to expand ener...

Page 9: ...ion failure happens Forced power off when battery does not connect to mains supply press POWER button for two seconds and battery powers off Activation input 45V 60V via P P terminals battery will be...

Page 10: ...10 45 Optimal operating temperature 0 30 7 Storage conditions Within 6 month after initial charge temperature 20 45 humidity 5 RH 95 RH 8 Room temperature cycle life 25 C 6000 cycles 60 EOL 9 Cooling...

Page 11: ...5o 5o is allowed for both installation against wall and floor Additionally the distance between the bottom part of battery and floor should not exceed 500mm Please refer to figures below means accepta...

Page 12: ...lic plier Insulated gloves Safety goggle Safety shoes 3 3 installation Procedures Pre installation Check Check exterior package before opening package check for damages like holes cracks or other trac...

Page 13: ...1 PCS Optional Accessories Single battery Parallel connected batteries Fastening M8 expansion screw 2PCS M8 H60 anchor bolt 2PCS Gradienter 1PCS M8 expansion screw 4PCS M8 H60 anchor bolt 4PCS Gradie...

Page 14: ...ert power cable and network cable into battery terminals Having confirmed fixed installation plug power cables into battery terminals orange positive terminal and black negative terminal Plug CAN netw...

Page 15: ...ots Move battery away Choose an alloy drill bit with a diameter of 12mm and install it in the drill Drill two holes in the spots that have been confirmed in step 1 Keep the drilling depth as least 60m...

Page 16: ...screw Step 2 Make power cables 1 Strip cable sheaths for 20 0 5mm with orange positive cable and black negative cable Insert sealing sealing nut and protection cover along the cable as shown 2 Insert...

Page 17: ...o wires stay aligned and keep consistent between wire color and pin 3 Crimp the RJ45 plug with a wire crimper 4 Connect RJ45 plug with joint sleeve and tighten up sealing sealing nut and joint sleeve...

Page 18: ...ery bus bar box and wall as shown unit mm Step 2 Insert power cables into battery terminals Make the power cables of both batteries based on Section 4 2 Step 2 Plug one end of positive and negative te...

Page 19: ...two batteries and CAN network cable only applies to the communication between battery and PCS Ensure two batteries in parallel connection are from the same batch same model and same manufacturer Do no...

Page 20: ...fore checking battery Measure battery voltage with a multi meter and ensure voltage output under off mode is 0V If any abnormality is detected when powering on immediately power off the battery Procee...

Page 21: ...normal battery powers on successfully 2 If the ALM light turns red the indication shows a failure The failure shall be fixed before powering on again Power on parallel connected batteries by pressing...

Page 22: ...communication between batteries works 2 If the ALM light of one battery or both batteries turn red there is a parallel connection failure and should be fixed before powering on again 6 3 Power off Ba...

Page 23: ...inals For wall mounted battery rotate both latches upward Two persons lift up battery off bracket For floor standing battery unscrew expansion screws with a cross screwdriver rotate latches upward and...

Page 24: ...cell voltage below the threshold for under voltage protection There is over discharge risk User should stop discharging and arrange recharge Protection against level three charge over voltage Single...

Page 25: ...and battery Protection against short circuit discharge Protection against prallel connection failure Communication failure between two parallel connected battery Check if RS485 wire between PCCKs and...

Page 26: ...ailure Current limitation failure ALM light maintains on There is safety risk and user should stop using battery User should contact installer to repair battery T 86 0755 2747 1942 E service ginverter...

Reviews: