Installation Procedure

6-2

Note

:  

 When stacking, make sure that all batteries are aligned and lock the safety bolt.

Note

:  

1.The battery base is required while installing the battery system  .
2. The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by 
the way of multiple clusters in parallel.
3. Please install indoors and ensure the level of the ground.

1

5

0

m

d

5

0

0

m

m

3

2

4

Installation Location Requirements

 6.Floor installation with base

6-1

Wall

150mm

150mm

90

°

90

°

Ground

Ground

Ground(2

8 clusters installation)

5.Battery operation panel introduction

. . .

Cluster 1

Cluster 2

Cluster 8

1

5

0

m

d

5

0

0

m

m

Cluster 3

1

2

3

4

5

6

7

8

9

10

11

Fault light

SOC light

Power button

Negative terminal

Positive terminal

Communication between battery packs
            of single cluster

USB interface

Link-out for multi-cluster in parallel communication

Link-in for multi-cluster in parallel communication

PCS CAN communication

GND terminal

1
2

3

4

5

6

7

8

9

10

11

 7.Wiring

Single cluster wiring 

7-1


Battery-

PE

CAN communication

AXE 5.0L Cable

To PCS

Note:

  1) Please install the communication line first, then plug the unused RJ45 port and

           USB port with a dust cover, and finally install the power line.
           2) No cable connection required between battery packs in a single battery cluster.

RJ45 dust cover

USB dust cover

PC

S

PC

S

Press down

PC

S

Check accessories

4-2

AXE 5.0L Base

(Any of them)

AXE 5.0L

A

B

AXE 5.0L  Cable

Installation Method 

Compound Mode 

C

A*M+B+C

Standard floor installation

Floor installation into N columns

A*M+B*N+C*N

(2000

±

25)mm

RJ 45 dust cover

USB dust cover

Note

:

 "M" means the number of batteries, "N" means the number of clusters.