background image

AXE 5

.

0L

Quick Installation Manual

1.Installation environment

Max

. +

50

Min

.

0℃

2.Installation tools

3.Battery size

4.Check

5

Indoor installation

650mm

1

4

0

m

m

350mm

1

PCS

Link-in

L

in

k

-o

u

t

PCS

Link-in

L

in

k

-o

u

t

PCS

Link-in

L

in

k

-o

u

t

PCS

Link-in

L

in

k

-o

u

t

To PCS CAN

Wiring of Multi-clusters battery in parallel 

7-2

Cluster 1

Cluster 2

Cluster 3

Cluster 8

...

8.Key operation

Power button

Note:

  When multiple battery syetem are used in parallel connection, you only need to press one key of any

           module to start the system.and also press one key to shut down the battery system.
         

9.Service and contact

Shenzhen Growatt New Energy CO.,Ltd

     86 0755 2747 1942

[email protected]

W:www.ginverter.com

Growatt New Energy

Situstion

System off

System on

Touch

Press(

2S)

Press(

2S)

Press once

Definition

No reaction

Power on

Shut down

Press

Note

: 1.Supports up to 8 clusters in parallel.

2.The power combiner box needs to be prepared by the user.

4-13/F,Building A,Sino-German,Europe,Industrial Park,
Hangcheng Ave,Guxing Community,Xixiang Subdistrict,
Bao’an District,shenzhen,China.

Check AXE 5.0L

 

packing list

4-1

AXE 5.0L *1 

Warranty card *1

Certificate of conformity *1 

Warranty 

card

Certificate o

conformity

Quick installa

tion

 Manual

User

 

Manual

Quick installation Manual * 1

User Mannual *1 

RH

.+

5

%~+

85

%

Battery HUB

. . .

C

A

co

m

m

u

n

ic

a

tio

n

P

o

w

e

r+

P

o

w

e

r-

P

E

To PCS

Cluster 1

Cluster 2

Cluster 3

Cluster 8

Reviews: