background image

WWW.gronomics.com

East Bethel, MN USA  

763-753-7374

Continued 

Install the 45-1/2” x 8” x 1” side rail w/logo (Item 4)
(w/Logo facing away from you) onto the top of side rail
w/cleat.

Slide the side rail w/Logo into the slot on the corner
post until tabs are locked to corner post.

Side Rail Assembly

3

4

Logo Facing Away

Align the 4” x 4” x 31” corner post (Item 1) with slots
facing you and slots facing the ends of the 45-1/2” x 8”
x 1” side rail w/ cleat (Item 2) and 45-1/2” x 8” x 1” side
rail w/Logo (Item 4).

Slide the corner post onto the side rails until the tabs on
the side rails lock to the corner post.

Repeat steps 1 - 4 for the two remaining 4” x 4” x 31”
corner posts, 45-1/2” x 8” x 1” side rail w/cleat and 45-
1/2” x 8” x 1” side rail.

Side Rail Assembly Continued

4

4

1

2

Align two 21-1/2” x 8” x 1” side rails (Item 3) to the 4” x
4” x 31” corner post slots.

Slide the side rails into the corner post slots until the
tabs on the side rails lock to the corner post.

End Rail Assembly

5

3

3

Align the other side rail assembly (as shown).

Align the corner post (Item 1) slots to the 21-1/2” x 8” x
1” side rails (Item 3).

Slide the corner post onto the side rails until the side
rail tabs lock to the corner post.

End Rail / Side Rail Assembly

6

1

Side Rail assembly

3

Reviews: