www.gronomics.com
East Bethel, MN USA
763-753-7374
End Rail Assembly
Install two 31” x 5-1/2” side rails (Item 2) into the slots
and slide to the bottom of the slots.
2
Final Side Rail Assembly
4
Install the remaining 31” x 5-1/2” side rails (Item 2) into the
slots and slide down.
Flip the garden bed right side up.
NOTE: Ground preparation is optional. It is recommended
to level an area under the frame of the garden bed before
placing the garden bed and
fi
lling with soil.
Soil Capacity: 8.6 Cubic Feet
2
2
3
2
Garden Bed Right Side Up
Logo