www.gronomics.com
East Bethel, MN USA
763-753-7374
5
Bottom Board and Fabric Installation
Place one 31” x
4
-1/2” corner notched bottom board (Item 4) on
each end of the garden bed.
Place four 31” x 5-1/2” bottom boards (Item 5) into the garden bed. (Gap
boards evenly to allow for water drainage).
Place fabric liner into the garden bed.
Soil Depth: approximately 12-1/2”
Soil Capacity: 8.6 Cubic Feet
3
Side Rail Assembly (Continued)
Install two 31” x 5-1/2” side rails (Item 3) into the slots and slide down to
the bottom of the slots.
4
5
6
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 6) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
6
4
Final Side Rail Assembly
Install eight remaining 31” x 5-1/2” side rails (Item 3) one w/Logo into the
slots on each side of the garden bed and slide down.
NOTE: Make sure the boards tongue and grooves fully seat together.
3
Logo
3
3