background image

4

English

Application 

Operation is possible in conjunction with:
- Pressurized storage heaters

Operation is 

not

 possible with:

- Low-pressure storage heaters (displacement water heaters)

Specifications 

• Flow rate at 45 psi flow pressure:

20 418 

00A

/20 419 

00A

4.5 L/min or

1.2 gpm

20 418 

000

/ 20419 

000

5.7 L/min or

1.5 gpm

• Flow pressure 

- min. 

7.25 psi

- recommended 

14.5 - 72.5 psi

- greater than 72.5 psi, fit pressure reducing valves

• Max. operating pressure

145 psi

• Test pressure 

232 psi

• Temperature

- max. (hot water inlet)

158 

°

F

- thermal disinfection possible

• Water connection

cold - Right hand

hot - Left hand

Notes:

Major pressure differences between cold and hot water supply 
should be avoided.

Installation

Refer to the dimensional drawing on page 1.

Flush piping system prior and after installation of faucet 
thoroughly! 

Side valves,

 see Figs. [1] and [2].

Valve with a groove on the top edge of the cartridge (A) and 
in addition marked with COLD should be mounted on the 
right (cold water) side.

Valve without a groove on the top edge of the cartridge (A) 
and in addition marked with HOT should be mounted on the 
left (hot water) side.

1. Screw the mounting set (B) to the bottom of the thread of the 

side valve (C). 
Make sure that the rubber washer (B1) is on the top of the 
fiber washer (B2).

2. Insert the side valve (C) through the tub deck hole from 

below.

3. Place the seal (D) on the basin and screw down the 

escutcheon (E) until it stops.

4. Tighten the mounting set (B) from below to secure the valve.
5. Close the cartridges (clockwise for the hot side and counter-

clockwise for the cold side).

6. Attach hoses (C1) to side valve (C).

Mount lever handle, 

see Fig. [1].

1. Push on lever (F) and tighten with set screw (F1).
2. Insert plug (F2).

It is recommended that the lever (F) be installed so they point 
away from the spout when in the off position.

Spout,

 see Fig. [3].

1. Place the O-ring (K1) on the basin and insert the spout (K) 

from above.

2. Secure the spout (K) with the mounting set (L).

Mount pop-up drain

, see Page 6.

Ensure that flange of pop-up drain is sealed.

Connector,

 see Fig. [4]. 

1. Install the connector (M) to the spout (K) with clamp (M1).

2. Attach hoses (C1) to the connector (M).

Connect faucet

Connect the side valves to the water supply. Insure the 
supplied washers are used for all connections.

The cold water supply should be connected on the right side 
valve (marked COLD) and the hot water supply to the left valve 
(marked HOT).

Open cold and hot water supply and check connections 
for leakage!

Maintenance

Inspect and clean all parts, replace as necessary and grease 
with special grease.

Shut off cold and hot water supply!

I. Ceramic cartridge,

 see Fig. [5].

Secure side valve against sliding back.

1. Lever out plug (F2) and screw out set screw (F1).
2. Pull off lever handle (F) and unscrew escutcheon (E).
3. Pull off seal (D) and splined adapter (G).
4. Unscrew ceramic cartridge (A) using a 17mm wrench.
5. Change complete ceramic cartridge (A) or O-ring (A1).

Observe the different replacement part numbers of the 
cartridges,

 see Page 6.

II. Flow straightener, 

see Page 6.

Unscrew and clean flow straightener (46 837 / 48 300).

Assemble in reverse order.

Replacement parts,

 see Page 6 ( * = special accessories).

Care

Instructions for care of this faucet will be found in the Limited 
Warranty supplement.

3

Summary of Contents for GRANDERA 20 418

Page 1: ...AE 12 TR 17 EST 22 UA 27 F 3 DK 8 GR 13 SK 18 LV 23 RUS 28 E 4 N 9 CZ 14 SLO 19 LT 24 I 5 FIN 10 H 15 HR 20 RO 25 DESIGN ENGINEERING GROHE GERMANY www grohe com 20 418 20 419 GRANDERA 99 0064 131 M 23...

Page 2: ...v p remettre cette instruction l utilisateur de la robinetterie Entregue estas instrucciones al usario final de la grifer a Please pass these instructions on to the end user of the fitting 1 20 418 20...

Page 3: ...3 1 C B A B1 B2 32mm 19mm F E 3mm C1 F2 F1 D 19mm COLD HOT 4 19mm K C1 C1 M1 M 3 K1 K L 23mm F1 F2 G F 5 17mm 17mm 45 882 45 883 E COLD HOT A1 A 3mm D 2 2...

Page 4: ...r the hot side and counter clockwise for the cold side 6 Attach hoses C1 to side valve C Mount lever handle see Fig 1 1 Push on lever F and tighten with set screw F1 2 Insert plug F2 It is recommended...

Page 5: ...froid 6 Brancher les flexibles C1 sur les robinets d arr t C Installer le levier voir fig 1 1 Poussez le levier F et serrez avec la tige filet e F1 2 Introduire le bouchon G2 On lui recommande que le...

Page 6: ...vulas laterales C Instalar la palanca ver la fig 1 1 Empuje la palanca F y apriete con el tornillo prisionero F1 2 Inserte el tap n F2 haciendo palanca Se recomienda que la palanca F sea instalado tan...

Page 7: ...II 6...

Page 8: ...0 info grohe co jp KZ 7 727 311 07 39 info cac grohe com LT 372 6616354 grohe grohe ee LV 372 6616354 grohe grohe ee MAL 1 800 80 6570 info singapore grohe com N 47 22 072070 grohe grohe no NL 31 79 3...

Reviews: