-6-
T10096 Taper Attachment
—If parallelism is greater than 0.050", go to
Step 27.
—If parallelism is 0.050" or less, go to
Step
29.
26. Loosen four mounting cap screws and rotate
taper attachment left or right to correct align-
ment (see
Figure 19).
Figure 20. Roll pin installation.
Drilled-Out Roll
Pin Bores
Figure 19. Parallelism correction.
Rotate Slightly
27. When alignment is 0.050" or less, retight-
en cap screws, and double check your
parallelism.
28. Using existing 7.5mm diameter holes in taper
attachment housing as drill bit guides (see
Figure 20), drill two 8mm diameter holes
13mm deep into carriage.
29. Position and hammer in directional roll pins
so they will permanently lock taper attach-
ment in current alignment position.
30. Re-install lathe splash guard.