Grill'D Soul Stell Installation And Operation Manual Download Page 7

7

2.

Put 3-4 logs on the grate 

in such a way as to ensure free access of air to the combustion

area, namely: lay the firewood loosely, adjust the ash drawer gap to be within 50 mm.

In heater models of Short version firewood can be loaded vertically.

3.

Ignite the firewood

 loaded into the firebox. The preferred ignition method is using birch

bark, wood chips and other natural materials, or using paper or throwaway newspapers.

4.

Close the door.

5.

Partly close the ash drawer

 after heating up of the chimney and development of

stable draft (usually after burning of the first load of firewood, approximately in 30-45

minutes), leaving a gap within 10 mm. It is necessary to constantly ensure sufficient

draft, while avoiding the development of excessive one (it can manifest itself as

humming of the heater, too erratic flame), that leads to heating of the firebox red hot,

which significantly reduces the heater service life. Control the draft by adjusting the ash

drawer gap.

6.

Close the ash drawer completely

 after the air in the bath house heats up to a

temperature of 60-70

о

С.

7. As a rule, 1-2 logs are enough 

to maintain the temperature in the steam room.

 In case

the temperature decreases, open the ash drawer and adjust the gap within 3-10 mm in

order to kindle the firewood (it takes more time, when the ash drawer is closed), and

close the ash drawer afterwards. If the temperature keeps decreasing, then adjust the

ash drawer gap within 3-10 mm and keep it until the temperature reaches 60-70оС,

then close the ash drawer. 

Bear in mind,

 that excessive heating (for example, several

full loads in a row) leads to overheating and shortens the heater and chimney service

life, and can also cause a fire.

8.

When additional firewood is required,

 open the door smoothly, without jerks. Load the

firewood and close the door. Adjust the draft.

9. After the completion of bathing procedures 

prepare the room and the heater for

 

closing:

 

they are to be aired and dried. To do so:

• Put 4-5 logs into the heater firebox, kindle them. Set the ash drawer gap to be

approximately 10 mm. Open the hatches/windows, that serve for airing, and the door in

order to develop a small draft.

Note: the air and the bath house to remain heated, the air to move barely noticeably,

i.e. it shall be quite warm or even hot in the bath house (up to 60-70оС).

• Heat up the bath house in this mode, the firewood will burn in approximately 30-45

minutes. Completely close the ash drawer after formation of active red coals. Close the

hatches/windows and the door, leave the bath house until next use.

• The room and the heater to be periodically checked after such stokings:  there shall be

no water or moisture in the stone heater, the stones shall be dry, and so shall be the

boards in the rooms. If the rooms and the heater did not dry thoroughly, it is allowed to

carry out additional stoking of the heater with a completely closed ash drawer.

IMPORTANT! The following is prohibited:

 

using explosive, toxic, highly flammable substances, paints, solvents, gasoline, etc., to 

ignite the firewood;

 

operating the heater at a constant excessive draft in the firebox.

IMPORTANT!

Partial burning out of heat-resistant enamel is possible on the most thermally loaded

elements of the heater during operation, which is not a manufacturing defect.

The firebox metal may become slightly deformed during operation, which is not a

manufacturing defect provided the integrity of weld joints is preserved.

Summary of Contents for Soul Stell

Page 1: ...service life of the Grill D brand heaters Read the manual carefully before commencing installation and operating the heater Keep it for future use Installation and Operation Manual Congratulations on...

Page 2: ...ration 6 2 7 Water in the sauna 8 2 8 Maintenance 8 2 9 Typical faults and troubleshooting methods 9 3 INSTALLATION MANUAL 10 3 1 Before commencing installation of the heater 10 3 2 Heater installatio...

Page 3: ...ote that When selecting a heater it is necessary to give consideration to the material of the walls and the ceiling of the room of installation If they are not heat insulated concrete brick glass etc...

Page 4: ...air from the firebox into the closed stone heater and stoking in the heating flue itself Also air convection between the heater firebox radiators and protective shield plays a significant role Heater...

Page 5: ...ess of air to the combustion area namely lay the firewood loosely adjust the ash drawer gap to be within 50 mm 3 Ignite the firewood loaded into the firebox The preferred ignition method is using birc...

Page 6: ...leather etc 2 5 Stones for stone heater The permissible stone sizes are given in Table 1 Only the stones intended for sauna shall be used as heater stones IMPORTANT Put the stones into the heater only...

Page 7: ...eating and shortens the heater and chimney service life and can also cause a fire 8 When additional firewood is required open the door smoothly without jerks Load the firewood and close the door Adjus...

Page 8: ...safety Use personal protective equipment required for such works The heater and chimney shall be cleaned of soot before the commencement of the heating season as well as during the entire heating sea...

Page 9: ...ce with the application instructions 2 Fault The sauna room is not heating up Possible cause The sauna room is too large for the heating capacity of the heater Thermal insulation of the room is not in...

Page 10: ...ion of the heater IMPORTANT Make sure that all safety distances around the heater are observed There shall be no electrical appliances cables meltable and flammable materials within the safety distanc...

Page 11: ...cal cables water supply and sewage pipes in the concrete under the heater B Floor with tile finish The materials laid under the tiles such as glue waterproofing and so on are not resistant to heat rad...

Page 12: ...or is made of combustible material it is necessary to install floor protection made of non combustible material IMPORTANT Make sure that the floor is capable of withstanding the heater load Take measu...

Page 13: ...if any Keep in mind the requirements of its operations manual 3 A valve can be installed on the connecting pipe if additional adjustment of draft is necessary Install if any 4 Insert the connecting pi...

Page 14: ...talling a chimney installing a water tank etc the maximum permissible load shall be considered It shall be equivalent to the sum of a filled water tank with a volume of 70 l max and two heat insulated...

Page 15: ...15 Figure 5 Stone chimney connection Figure 6 Steel chimney connection...

Page 16: ...elease the Manufacturer from responsibility 4 WARRANTY The warranty period for the Product is 12 months from the date of purchase by the Consumer but not more than 24 months from the date of shipment...

Page 17: ...17 Zorro Short APPENDIX 1 Heater dimensions Note dimensions are in millimeters 450 760 860 100 460 115 435 115...

Page 18: ...18 450 760 860 100 460 240 165 435 665 765 180 280 115 Zorro long...

Page 19: ...ding 3 Door 4 Decorative frame 5 Ash drawer 6 Heating flue 7 Heater flue outlet connection 8 Cap 9 Closed stone heater 11 Water tank 50 l 11 Decorative screen Zorro APPENDIX 2 Heater structural elemen...

Page 20: ...20 APPENDIX 3 Internal design and operation of heaters Zorro heater with a closed stone heater Zorro heater with cap...

Page 21: ...e plates A separate seat is provided for each plate Ash drawer Place of installation and installation method for the ash drawer are shown in the figure IMPORTANT The works shall be carried out in an e...

Page 22: ...ic and the fixed parts together with roofing screws included into delivery package from the inside of the heating flue from the sides 5 Close the gap between the telescopic and the fixed parts of the...

Page 23: ...with a plastic brush and waste cloth Clean after complete cooldown of the heater Door The firebox door can be mounted in such ways that it will open either to the right or to the left To do so it is n...

Page 24: ...ts that are holding the heater cap Remove the baffle plate included into the package 6 2 Install the baffle plate included into the closed stone heater package on supports all the way to the back wall...

Page 25: ...ed the hole with the thermal sealant 4 Install the funnel and tighten the winged nuts Decorative frame If necessary the frame can be dismounted via unscrewing the eight self tapping screws on the side...

Page 26: ...only after installation of the heater on the place of permanent operation Procedure 1 Match the mounting holes on the screen and on the heating flue frame 2 Fix the screen with the self tapping screw...

Page 27: ...ater firebox with metal cladding pcs 1 1 Door pcs 1 1 Ash drawer pcs 1 1 Grate plate pcs 4 4 Cap pcs 1 1 M8 winged nut pcs 6 6 Decorative frame pcs 1 Self tapping screw for the screen pcs 6 Metal self...

Page 28: ..._________________________________________________________________ Name signature stamp Date of sale ________________________________________________________________ Date Seller s signature store stam...

Reviews: