3.2.1. Stone chimney connection

The diameter of hole for connection to the chimney stack shall be about 20 mm larger than 

the diameter of the heating flue outlet pipe, so the optimum clearance around the pipe is 

about 10 mm.

If the designed pipe inlet to the stone chimney is at 90°, it is recommended to make the 

inner edges of the chimney stack bore round (Figure 5) in order to reduce the resistance for 

flue gas passage.
If you plan to use a heater rack, for example, then take into account the height of the heater 

together with the rack when preparing the hole.

Procedure:

1.  Install the heater on the place of permanent operation.
2.  Install a water tank, if any. Keep in mind the requirements of its operations manual.
3.  A valve can be installed on the connecting pipe, if additional adjustment of draft is 

necessary. Install, if any.

4.  Insert the connecting pipe into the stone chimney. Do not push the connecting pipe too 

deep into the stone chimney, as you can block it.

5.  Connect the heater with the pipe inserted into the stone chimney.
6.  Ensure that all the pipe connections and the heater connection are reliable..

7. 

Seal the gap between the pipe and the wall using non-combustible mineral wool, for 

example.

8.  Make sure that the air-tight seal is good. Add mineral wool, if necessary.

IMPORTANT! Familiarize yourself with the manufacturer’s detailed instructions on the safe 

distances and installation of steel chimney elements, as well as the water tank.

Some installation options are depicted in Figure 5.

3.2.2. Heater connection to a steel chimney

Steel chimneys can be used for flue gas withdrawal. As a rule, it consists of separate 

modules that can be coupled with each other, and that form a single duct for flue gas 

withdrawal.

Chimneys can be installed directly from the heater through the ceiling and roof, or at an 

angle through the wall.

If you plan to use a heater rack, for example, then take into account the height of the heater 

together with the rack when preparing the hole for passage of the pipe through the wall.

The procedure for installing the pipe at an angle:

1.  Install the heater on the place of permanent operation.
2.  Install a water tank, if any. Keep in mind the requirements of its operations manual.
3.  A valve can be installed on the connecting pipe, if additional adjustment of draft is 

necessary. Install, if any.

4.  Install all the necessary components of the outside chimney.
5.  Insert the connecting pipe into the outside chimney.
6.  Connect the heater with the pipe inserted into the outside chimney.

7. 

Ensure that all the pipe connections and the heater connection are reliable. 

Note: when installing the chimney from the heater directly through the ceiling and roofing 

system, all the elements are installed consecutively.

Summary of Contents for Dubravo 180 Long

Page 1: ...heaters Read the manual carefully before commencing installation and operating the heater Keep it for future use Installation and Operation Manual Congratulations on your choice the choice of high qua...

Page 2: ...operation 6 2 7 Water in the sauna 7 2 8 Technical maintenance 7 2 9 Typical faults and troubleshooting methods 8 3 INSTALLATION MANUAL 10 3 1 Before installing the heater 10 3 2 Heater installation...

Page 3: ...50 Maximum firewood length mm 320 390 Firewood diameter mm 80 150 80 150 Mass kg 42 47 60 62 77 Width mm 510 510 570 570 650 Height mm 795 795 940 940 940 Depth mm 585 780 670 780 885 790 Fuel Wood Wo...

Page 4: ...5 15 Consequently this room is equivalent for a sauna room with a volume of approximately 15 m3 2 OPERATION MANUAL Read this manual carefully before commencing installation and operating the heater Ke...

Page 5: ...aning of the heater without interruption of burning The grate is one of the most thermally loaded parts of the heater it is fabricated of high duty rolled steel with a thickness of 5 mm The heater fir...

Page 6: ...of combustion coal wood chipboard plastic pellets and so on painted or impregnated wood waste plastic rubber textiles leather etc 2 5 Stones for stone heater The permissible stone sizes are given in...

Page 7: ...ning out of heat resistant enamel is possible on the most thermally loaded elements of the heater during operation which is not a manufacturing defect The firebox metal may become slightly deformed du...

Page 8: ...ds creating high temperature in the heater firebox and chimney is prohibited for the purposes of burning the soot deposited in them The stones deteriorate with time as the heater is operated this is w...

Page 9: ...ntenance paragraph 2 8 Inspect the stone heater for compliance with the requirements paragraph 2 5 Remove stone chips and replace them with intact stones Replace the stones with diameters less than th...

Page 10: ...lease address the local fire department Check the availability of all the heater component parts Make sure that all the heater bolted connections are tightened 3 1 1 Configuration of sauna ventilation...

Page 11: ...yers of heat insulating non combustible heat reflecting materials of sufficient thickness In case the floor in front of the heater door is made of combustible material it is necessary to install floor...

Page 12: ...Heater installation IMPORTANT Ensure proper floor levelling for the heater installation possible slants of the heater and the chimney are precluded Figure 4 Safety distances min 60 mm A min 60 mm A F...

Page 13: ...if necessary IMPORTANT Familiarize yourself with the manufacturer s detailed instructions on the safe distances and installation of steel chimney elements as well as the water tank Some installation o...

Page 14: ...nsumer The service life of products while meeting the requirements of the operation manual and the installed combustion chamber reinforcement is at least 2000 hours while without combustion chamber re...

Page 15: ...15 Figure 5 Stone chimney connection Figure 6 Steel chimney connection...

Page 16: ...16 Dubravo mini Long Dubravo mini Short APPENDIX 1 Heater dimensions Note dimensions are in millimeters 585 385 235 510 795 210 375 255 115 780 385 235 510 795 210 375 230 170 115...

Page 17: ...17 386 780 885 386 780 885 Dubravo 180 Short Dubravo 180 Long 670 385 570 940 235 210 375 285 115 230 110 215 780 885 570 940 235 210 385 375 115...

Page 18: ...18 Dubravo 180 Window 790 940 650 600 450 115 460 180 570...

Page 19: ...ater flue outlet connection 3 Heating flue 4 Ash drawer 5 Steel door mini APPENDIX 2 Heater structural elements 2 1 9 3 6 Thermal glass door Short Long 7 Thermal glass door Window 8 Decorative screen...

Page 20: ...ion Grate The grate consists of 6 separate plates A separate seat is provided for each plate IMPORTANT The works shall be carried out in an extremely careful way eliminating the possibility of damage...

Page 21: ...cement Procedure refer to the figure below 1 Install the back plate with a convex part to the wall of the firebox The upper part of the plate shall rest on the firebox wall while the lower part shall...

Page 22: ...thin the prescribed limits Procedure 1 Unscrew the transport self tapping screws in the upper part of the heating flue take its telescopic part out 2 Install the heater on the place of permanent opera...

Page 23: ...tion subsequent cleaning of surfaces should be carried out in accordance with the sealant application instruction Procedure 4 1 Apply the sealant from the rim side of the telescopic side along the who...

Page 24: ...ing hole of the door Note insert the pin at an angle 2 Slide the pin up to let install the bottom of pin into the lower mounting hole of the door 3 Insert the top of pin into the upper mounting hole o...

Page 25: ...ort Long Window Heater firebox with protective shield pcs 1 1 1 1 1 Door mini pcs 1 1 Short Long door pcs 1 1 Door Window pcs 1 Ash drawer pcs 1 1 1 1 1 Grate plate pcs 6 6 6 6 6 Decorative screen pcs...

Page 26: ...26 Notes...

Page 27: ...27 Notes...

Page 28: ..._________________________________________________________________ Name signature stamp Date of sale ________________________________________________________________ Date Seller s signature store stam...

Reviews: