background image

15

03.2012 | G25667 | Printed in Germany

1  Information

These Assembly and Operating Instructions contain important advisory notes which must be 

followed by all means to ensure appropriate assembly and trouble-free operation.
The details and specifications given in these instructions are to be observed by door fabricators, 

installers, and operators.

1.1  Technical description

• 

Self-locking multipoint door lock

• 

Motor-driven release

• 

"GU-SECURY Automatic with A-opener

• 

Latchbolts throwing 20 mm / secured against being forced back

• 

VdS approval class A

1.2  Application range and intended use

• 

SECURY Automatic with A-opener is designed for vertically installed doors.

• 

Its major field of application is house entrance doors both in private and public buildings.

• 

'Intended use' comprises the observance of the manufacturer's operating and service 

instructions which is essential for the avoidance of damage and injury.

• 

GU excludes any liability for damage arising from changes made on the lock without their 

consent.

All deliveries are made on the basis of our General Terms and Conditions

2  Technical and operational safety

  Danger ! 

Installation works involving the use of electrical equipment are 

dangerous.

 

Insufficient wire cross sections may cause a fire.

Therefore it is important to always observe the specified cross sections.

 

Connections to a 230V mains are dangerous to life !

Never connect the A-opener to a 230 V supply!

Summary of Contents for GU-SECURY Automatic with A-opener

Page 1: ...GU SECURY Automatic mit A ffner Montage und Bedienungsanleitung Technisches Datenblatt Seite 2 Page 13 GU SECURY Automatic with A opener Assembly and Operating Instructions Technical Data Sheet...

Page 2: ...e Symbole Symbol Signalwort Bedeutung Symbol Signalwort Bedeutung Gefahr Warnung vor Personensch den Info Besondere Funktionen oder Anwendungstipps Gefahr Gefahrenhinweis auf elektrische Energie Achtu...

Page 3: ...utomatic mit A ffner ist vorgesehen f r senkrecht eingebaute T ren Die Haupteinsatzbereiche sind Hausabschlusst ren im privaten sowie ffentlichen Bereich Die Einhaltung der vom Hersteller vorgeschrieb...

Page 4: ...A ffners mit der Steckerver bindung ist unbedingt darauf zu achten dass die Kabel im Schloss bzw Stulpbereich beim Einbau nicht gequetscht oder besch digt werden k nnen Abzweigdosen sollten f r Wartun...

Page 5: ...el Hauptschlosskasten 3 A ffner mit Anschlusskabel ca 6 m inkl Stecker f r A ffner und Aderendh lsen auf der Seite der Abzweigdose 4 Kabel bergang bauseits SECUREconnect 5 Abzweigdose bauseits ab hier...

Page 6: ...itte unbedingt die Angaben der entsprechenden Fr szeichnung Bei Unstimmigkeiten oder R ckfragen bez glich der Montage wenden Sie sich bitte an Ihren Vertriebspartner oder den Hersteller Allgemeine Ken...

Page 7: ...x13 5 DGS 4x13 5 DGS Gewinde f r Direktverschraubung in Druckguss und Duroplaste Schrauben im Lieferumfang M 2 5 3 Nm M 2 5 3 Nm Vor der Montage in die T r Schloss auf Leichtg ngigkeit der Zugstangen...

Page 8: ...istet Bei Dauerkontaktgabe am Entriegelungseingang bleiben die Automatikfallen des Schlos ses so lange zur ckgezogen bis der Kontakt wieder ge ffnet wird Diese Funktionsweise kann z B zur Entriegelung...

Page 9: ...en der Signalt ne ist exakt die gleiche Programmierabfolge notwendig 6 2 Probelauf Nach der Installation und jeder Ver nderung im Aufbau sind alle Funktionen durch Probelauf zu berpr fen Achtung Verle...

Page 10: ...nung V Gleichspannung Wechselspannung braun grau blau schwarz Steuerspannung zur Entriegelung Trafo pr fen und eventuell die Feinsicherung tauschen Klemmpunkte pr fen Fallen werden nach Bedienung zur...

Page 11: ...ienstleistungen Antriebsmontage und Inbetriebnahme J hrliche Sachkundigenpr fung nach geltenden Normen und Richtlinien Wartungs und Instandsetzungsarbeiten Umbau oder nderungen an bestehenden T r und...

Page 12: ...nblatt Technical Data Sheet Montage und Bedienungsanleitung Assembly and Operating Instructions GU SECURY Automatic mit A ffner GU SECURY Automatic with A opener 11 EG Konformit tserkl rung EC Declara...

Page 13: ...13 GU SECURY Automatic with A opener Assembly and Operating Instructions Technical Data Sheet...

Page 14: ...nal word Meaning Symbol Signal word Meaning Danger Warning of personal injury Info Special functions or user advice Danger Electrical hazard symbol sign Attention Property damage warning sign Caution...

Page 15: ...opener is designed for vertically installed doors Its major field of application is house entrance doors both in private and public buildings Intended use comprises the observance of the manufacturer...

Page 16: ...The cables must be laid in such a way that they cannot be squeezed in or damaged in the area of the lock for end during installation Distribution boxes must be accessible for maintenance work Cable t...

Page 17: ...al lock 3 A opener with connecting cable approx 6 m incl plug for A opener and wire end sleeves on side of distribution box 4 Cable duct not included in delivery SECUREconnect 5 Distribution box and 3...

Page 18: ...ng specifications given in the drawing below In case of any problems or questions please contact the distributor or manufacturer The appropriate installation of the drive requires general electrical a...

Page 19: ...aded screw for direct fixing into die cast and duroplasts screws included in delivery M 2 5 3 Nm M 2 5 3 Nm Before installing the lock in the door leaf It is important to ensure that the driving rods...

Page 20: ...the door has been pulled or pushed shut With continuous contacting on the door release input the automatic latchbolts of the lock remain retracted until the contact is open again This functioning prin...

Page 21: ...ctivated In order to activate the signal tones follow the same programming steps 6 2 Trial run After installation check all functions in a trial run Attention Risk of injury when reaching between door...

Page 22: ...onnected wrongly or not at all verify connections Voltage supply V direct voltage alternating voltage brown grey blue black control voltage for release Check transformer and exchange microfuse if nece...

Page 23: ...9 GU Customer services Installation of motor drive and start up Annual inspection in compliance with the prevailing standards and regulations Maintenance and repair works Retrofitting or changing exis...

Page 24: ...alten Errors and omissions reserved Subject to technical modifications Gretsch Unitas GmbH Baubeschl ge Johann Maus Str 3 D 71254 Ditzingen Tel 49 0 7156 301 0 Fax 49 0 7156 301 293 www g u com 0 4577...

Reviews: