
16
INSTALLING THE SIDE DISCHARGE CHUTE
(See Figure 8)
This mower has 3 different functions-mulch, side discharge, and rear bag. If you wish to
discharge the clippings rather than mulch, perform these steps.
• UNPLUG THE POWER CORD, AND WAIT FOR BLADE TO COME TO A COMPLETE STOP.
• Lift the side discharge cover (1).
• Align the slot on the discharge chute (2) with the pins on the underside of the discharge cover
(1).
• Lower the discharge chute (2) until the hooks on the mower deck are secured in the openings
in the discharge chute (2).
• Release the side discharge cover (1).
ASSEMBLY INSTRUCTIONS
Fig. 8
2
1
Summary of Contents for 25012
Page 28: ...28 EXPLODED VIEW...
Page 29: ...29 EXPLODED VIEW...
Page 32: ...32 NOTES...
Page 33: ...33 NOTES...