1. Choice of anchoring method. The optimal methods are chains or steel 
cables. 

2. Measurement of the distance from the luminaire to the ceiling. 

3. Installation of the anchoring method in the ceiling to the appropriate 
measure, taking the connection to the current from the ceiling to the point 
of the luminaire. 

4. Anchoring the luminaire to the cable or chain. 

5. Connection to the electrical network. 

6. The installation is complete. Reconnect the power and carry out the 
necessary checks. 

 

 

 

 

Summary of Contents for 1177-HB -JL08 R-M100W-CW

Page 1: ...Campanas LED Led High Bay MANUAL DE INSTRUCCIONES INSTRUCTION MANUAL...

Page 2: ...LA DE CONTENIDOS TABLE OF CONTENTS ES Recomendaciones Generales 1 Introducci n 2 Instalaci n 2 Recomendaciones Finales 4 EN General Recommendations 5 Introduction 6 Installation 6 Final Recommendation...

Page 3: ...ctricas recuerde siempre Cortar todas las fuentes en tensi n Bloquear los aparatos de corte Verificar la ausencia de tensi n Poner a tierra y en cortocircuito todas las posibles fuentes de tensi n Del...

Page 4: ...rotecciones IP seg n modelos que las hacen adecuadas para distintos tipo de ambientes Su uso es muy com n en almacenes naves industriales gasolineras talleres f bricas supermercados exposiciones gimna...

Page 5: ...naria al techo 3 Instalaci n del m todo de anclaje en el techo a la medida adecuada llevando la conexi n a la corriente desde el techo hasta el punto de la luminaria 4 Anclaje de la luminaria al cable...

Page 6: ...previamente los elementos de papel los de pl stico u otros materiales y t relos en los contenedores adecuados separados seg n el tipo de basura Los productos el ctricos no deben tirarse junto con los...

Page 7: ...s always remember Cut off all sources of tension Lock the cutting devices Check the absence of voltage Ground and short circuit all possible sources of voltage Delimit and mark the work area Use PPE P...

Page 8: ...ferent IP protections depending on the model that make them suitable for different types of environments Its use is very common in warehouses industrial buildings gas stations workshops factories supe...

Page 9: ...to the ceiling 3 Installation of the anchoring method in the ceiling to the appropriate measure taking the connection to the current from the ceiling to the point of the luminaire 4 Anchoring the lumi...

Page 10: ...rate the paper plastic or other items in advance and throw them away in the appropriate containers separated according to the type of garbage Electrical products should not be thrown away with househo...

Page 11: ...1 www greenice com 912 90 75 21...

Reviews: