background image

O

OP

PE

ER

RA

AT

TIIN

NG

G IIN

NS

ST

TR

RU

UC

CT

TIIO

ON

NS

S

T

TR

RO

OU

UB

BL

LE

E S

SH

HO

OO

OT

TIIN

NG

G

SETTING YOUR LIGHT SWITCH

a) Ensure light fitting(s) being controlled 

have bulb(s) fitted, otherwise light switch will 

not function.

b) After installation is complete, reconnect power 

at the mains (remembering to replace the fuse 

if removed for safety reasons).

c) Press reset button H with ball point pen and 

hold for two seconds.

SETTING TIME ON

This sets the time your light remains on for. The

time on period can be set from a minimum of 

1

hour to a maximum of

hours in 

1

hour 

increments. This is set by turning dial F (see first

diagram for reference) to the desired time i.e.

1

,

2

,

3

,

4

,

5

,

6

,

7

or 

8

hours.

PREPARING FOR OPERATION

STEP 

1

.

Slide the override switch E so that the automatic

position is showing, the red neon G will 

illuminate.

STEP

2

.

Ensure the room light is off, if necessary use the

push on/off switch (D).

STEP

3

.

As darkness approaches monitor when the

light(s) come on.

a. If the light comes on too early i.e. still too light

outside, use a small screwdriver to turn the

darkness sensitivity control B slightly towards D

(anti-clockwise).

b. If the light comes on too late i.e. too dark 

outside, use a small screwdriver to turn the 

darkness sensitivity control B slightly towards L

(clockwise).Close the front cover until it clicks into 

position concealing operation controls.

STEP 

4

.

For the next few days monitor the when the light

comes on. Fine adjustments to the darkness 

sensitivity control B will ensure that the light

comes on when you want it to. To achieve the

desired on time, this may also take a few days of

adjustments.

AUTOMATIC OR MANUAL 

CONTROL - OVERRIDE SWITCH

During those occasions when you are home early

and you do not want your light switch to operate

as set, slide the override switch E so that MAN

shows for manual operation. The light switch will

only operate via the push on/off switch (D), the

red neon (G) will not be illuminated.To revert back

to automatic operation i.e. light switch works to

the preset programme), slide override switch

(E) so that AUTO position is showing. Red

neon (G) will be illuminated and the light will

switch on when the pre-set level of 

darkness is reached.

MANUAL ON/OFF OPERATION

When all settings have been completed close

the front cover until it clicks into position 

concealing the operating controls. The room

light(s) can be turned on and off by simply

pressing the top of the front cover. The position

of the override switch (E) does not affect this

operation.With the front cover closed, the red

neon (G) will be illuminated or in manual

mode when it will be off.To access the controls

again, grip the front cover with forefinger and

thumb either side and ease the cover forward. 

FALSE ACTIVATION

Someone standing against the light switch for

more than 

30

seconds or a heavy thunderstorm

may result in early activation. When normal

light level is resumed, press the reset button

(H) for 

2

seconds. 

CHANGING A LIGHTBULB

In the event of a lightbulb ‘blowing’ the light

switch will fail to work.Always disconnect the

power before replacing the light bulb by pulling

the fuse carrier (A) forward until the fuse is

fully visible. It may be necessary to replace the

fuse following the replacement of a lightbulb if

the light switch does not operate when the

carrier (A) is pushed back into position.

Replace the old fuse by pushing it upwards

from the slot in the base of the carrier.

Note: After replacing a lightbulb, 

replacing a fuse or a mains power 

failure, press the reset button (H) 

for 

2

seconds.

FUSE REPLACEMENT

Always replace the fuse with a BS

646

rated

3

amp fuse. A normal 

3

amp fuse will not fit.

PROBLEM 

1

Light will not switch on

SOLUTION

-

Press reset button H.

-  Check that bulb has not blown.

-  Check wiring is correct.

-  Check fuse, by withdrawing fuse carrier A, 

incorrect wiring can blow the fuse.

-  The required level of darkness has not Been 

reached previously.

-  Wait until dusk then adjust darkness sensor 

C as described.

PROBLEM 

2

Sufficient light is prevented from being

detected by darkness sensor C

SOLUTION

-  Remove any soft furnishings or other 

obstructions from proximity.

PROBLEM

3

Light only operates correctly from one switch in a

two way circuit

SOLUTION

-  The wiring is incorrect, consult a qualified 

electrician.

Diagram 

7 - 

After

L

ight switch timer at 

5

wire end

Yellow & Green earths must

remain connected to metal box

Is

s

u

e

 n

o

7

0

1

5

6

9

WEST 

ROAD 

HARLOW

ESSEX  .  CM

20  2

BG  .  UK

s a l e s @ g r e e n b r o o k . c o . u k    

WWW.GREENBROOK.CO.UK

TECHNICAL DATA

Rated Voltage:

230

V, AC

50

Hz

Load:

Max 

400

W–Min 

40

W + most 

Low Energy (CFL) 

11

W & above

Tungsten bulbs only
Integral 

3

amp fuse

A

AL

LW

WA

AY

YS

S R

RE

EP

PL

LA

AC

CE

E W

WIIT

TH

H A

A S

SP

PE

EC

CIIA

AL

L

3

3

A

AM

MP

P B

BS

S

6

64

46

6

 F

FU

US

SE

E.. ((T

TH

HIIS

S IIS

S N

NO

OT

T A

AN

N

O

OR

RD

DIIN

NA

AR

RY

3

3

A

AM

MP

P F

FU

US

SE

E))

P

PL

LE

EA

AS

SE

E K

KE

EE

EP

P T

TH

HE

ES

SE

IIN

NS

ST

TR

RU

UC

CT

TIIO

ON

NS

S S

SA

AF

FE

E F

FO

OR

R F

FU

UT

TU

UR

RE

E

R

RE

EF

FE

ER

RE

EN

NC

CE

E

Reviews: