GREEN BANK WG48100 User Manual Download Page 17

- 16 - 

Three pcs connect diagram

 

 

 

 

Four pcs connect diagram 

 

 

NOTE : IF YOU NEED MORE PARALLEL DETAILS, PLEASE CONSULT WITH ENERGTECH SOLAR SALES 

ASAP.  

Summary of Contents for WG48100

Page 1: ...POWER BANKS STORAGE SYSTEM User Manual Version 1 0 WG48100 51 2V 100AH 5 12Kwh WG48250 51 2V 200AH 10 24Kwh WG48320 48V 320AH 13 44Kwh For On Off Hybrid Solar Storage System...

Page 2: ...ecifications 8 4 Safe handling guide 11 4 1 System Diagram 11 4 2 Tools 11 4 3 Safety Gear 11 5 Installation 12 5 1 Inventory of items 12 5 2 Installation Location 13 5 2 1 Minimum clearances Error Bo...

Page 3: ...ng list first if the battery is damaged or spare parts are missing please contact the dealer Before installation be sure to cut off the grid power and make sure the battery is in the turned off mode W...

Page 4: ...Life cycles 80 DOD 25 C 8500 Cycles Storage time temperature 5 months 25 C 3 months 35 C 1 month 45 C Operation temperature 20 C to 60 C 60 25 Relative Humidity Storage temperature 0 C to 45 C 60 25 R...

Page 5: ...stent performance over wide temperature range Wall mounted convenient installation Integrated state of the art BMS to manage and monitor battery information including voltage current and temperature a...

Page 6: ...address 4 CAN port CAN CAN port 5 RS485 port RS485 RS485 port 6 Port Reset button RST For reset the batter 7 Battery holder 8 Switch OFF ON Normal close 9 Handle 10 LED ALM Alarm indicator 11 LED RUN...

Page 7: ...6 Chart 2 Battery Capacity Chart 3 Battery status...

Page 8: ...omputer Address Reserved Address portal for multiple parallel connections 3 5 Wake Up button Battery On When battery is shut down press this RST button for 6 seconds It is activated when the LED light...

Page 9: ...nal Specifications Interface introduction Main menu page Electricity dormancy activated will show the welcome screen press the MENU button to enter the main menu page As shown in the figure below Batt...

Page 10: ...9 Battery temperature Battery Warning Battery Capacity...

Page 11: ...not shown press ENTER key can enter the corresponding page 3 Press ESC key can be returned at the next higher level directory In any position press NEMU key can return to the main menu page 4 In a do...

Page 12: ...se properly insulated tools to prevent accidental electric shock or short circuits If insulated tools are not available cover the entire exposed metal surfaces of the available tools except their tips...

Page 13: ...contact us immediately NO Item Quantity Specification 1 Battery Pack 1 PC 5 12KWH 10 24KWH 13 44KWH 2 Wall mounted Bracket and Screws 1 SET One Bracket and 12pcs screws 3 Power Cable 1 SET 35mm2 4AWG...

Page 14: ...temperature is within the range from 0 C to 45 C The temperature and humidity is maintained at a constant level There is minimal dust and dirt in the area Installation must be vertical or tilted backw...

Page 15: ...sition 3 Drill 8 holes according to the hole position it is 10 with depth 60mm 4 Hammer the M8 screws to the above holes and screw the nut Note Do not position screws flush to the wall leave 10 to 20...

Page 16: ...types When the battery needs to be used in parallel the maximum connection is 16 units but we recommend 2 4 units according to application When connecting with off grid 48VDC solar inverters it does n...

Page 17: ...16 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH ENERGTECH SOLAR SALES ASAP...

Page 18: ...s Canbus with hybrid solar inverter but we recommend to use 2 4 units according to application The application needs power and communication connections as below choose suitable parallel power cables...

Page 19: ...18 One pcs connect diagram Two pcs connect diagram...

Page 20: ...19 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH RELATED SALES MANAGER ASAP...

Page 21: ...lation instructions Incorrect usage or inappropriate operation Insufficient ventilation of the device Failure to observe the applicable safety regulations Force majeure Neither does it cover cosmetic...

Page 22: ...arranty Card User Information Company User Name Address Telephone Email Project installation location Product Information Battery Model Serial No Invoice Number Purchase Date Dealer Commission date Fa...

Reviews: