
Troubleshooting
(6)Overload and air exhaust malfunction diagnosis (following AP1 for outdoor unit control board)
Mainly detect:
Wether the PMV is connected well or not? Is PMV damaged?
Is refrigerant leaked?
Fault diagnosis process:
20 minutes after the
complete unit is
powered off
Is the terminal FA for the
electronic expansion valve
connected correctly?
Connect the
wires correctly
Resistances between the first four pins
close to the terminal hole and the fifth
pin are almost the same, less than 100
ohm.
Replace the electronic
expansion valve
If the fault is eliminated?
If the fault is eliminated?
Replace the
control panel
AP1
Coolant leakage, refilling
the coolant
End
55
Summary of Contents for GWH09AB-A3DNA1B
Page 34: ...8 SORGHG 9LHZV DQG 3DUWV LVW 8 QGRRU 8QLW 31...
Page 36: ...33...
Page 38: ...35...
Page 40: ...8 2XWGRRU 8QLW 37...
Page 42: ...39...
Page 44: ...41...
Page 50: ...47 Troubleshooting 9 2 Flashing LED of Indoor Outdoor Unit and Primary Judgement...
Page 68: ......