Ducted Type Split Air-Conditioner Units(Inverter Series) 

18 

Description of each stage of debugging progress 

—— 

Debugging code 

Instruction for Code and Operating Method 

Progress 

LED 

Display code 

Display 

status 

02_Address 

allocation 

02 

Bllink 

The system is allocating address, which might takes 10s. 

02/L7 

Display 

repeatedly 

No master indoor unit. 

It will display for 1min continuously. The user can set master 

through debugging the software within 1min. If no master unit 

is set manually within 1min, the system will set the indoor unit 

with the smallest IP address automatically as the master 

indoor unit. 

02/oC 

Display 

repeatedly 

Address allocation of the system is complete with master 

indoor unit. 

After displaying once circularly, the system will enter the next 

step automatically. 

03_ Confirm 

quantity of 

outdoor units 

03/ quantity of 

modules in the 

system 

Display 

repeatedly 

Confirmation of quantity of modules in the system.   

To differentiate from the debugging step, the QTY of module 

will display only 1-digit on the right. 

03/oC 

Display 

repeatedly 

After 10S, all the nixie tubes of modules will display “03” and 

“oC”, after displaying once circularly, the system will enter the 

next step automatically. 

04_Confirm 

quantity of indoor 

units 

04/Cb 

Display 

repeatedly 

The quantity of indoor unit is more than 1. 

The system shall not connect more than 1 indoor unit, after 

inspection, please redebug for confirmation. 

04/oC 

Display 

repeatedly 

The quantity of indoor unit is 1. 

After confirming the quantity of indoor unit, it will enter the next 

step 2s later. 

05_ Internal 

communication of 

outdoor unit 

05/C2 

Display 

repeatedly 

Communication error between master control and compressor 

drive. 

Please check the connection between the main board of 

outdoor unit and communication cord of drive board, after 

eliminating the errors, enter the next step. If the ODU should 

be powered off for troubleshooting, after re-energizing the 

unit, please conduct debugging from the above 01 step. 

05/oC 

Display 

repeatedly 

Communication between the master control of outdoor unit 

and drive is normal. 

After displaying once circularly, the system will enter the next 

step automatically. 

06_ Component 

detection of 

outdoor unit 

06/ 

Corresponding 

error code 

Display 

repeatedly 

Component error of outdoor unit. 

After eliminating all the errors, enter the next step 

automatically, if the ODU should be powered off for 

troubleshooting, after re-energizing the unit, please conduct 

debugging from the above 01 step. 

06/oC 

Display 

repeatedly 

No component error of outdoor unit. 

After displaying for 10s circularly, the system will enter the 

next step automatically. 

07_ Component 

inspection of 

indoor unit 

07/ 

Corresponding 

error code 

Display 

repeatedly 

Component error of indoor unit. 

After eliminating all the errors, enter the next step 

automatically, if the ODU should be powered off for 

troubleshooting, after re-energizing the unit, please conduct 

debugging from the above 01 step. 

07/oC 

Display 

repeatedly 

No component error of indoor unit. 

After displaying for 5s circularly, the system will enter the next 

step automatically. 

08_ Preheat 

confirmation of 

compressor 

08/oC 

Display 

repeatedly 

After displaying for 2s circularly, the system will enter the next 

step automatically. 

Summary of Contents for FGR50Pd/D2Na-M

Page 1: ...Owner s Manual Original Instructions Commercial Air Conditioners Ducted Type Split Air Conditioner Units Inverter Series Models FGR50Pd D 2 Na M FGR60Pd D 2 Na M...

Page 2: ...mage due to improper disassembly and inspection which may impact the normal operation of unit please do not disassemble the unit by yourself You can contact with the special maintenance center of our...

Page 3: ...rer will bear no responsibilities when personal injury or property loss is caused by the following reasons 1 Damage the product due to improper use or misuse of the product 2 Alter change maintain or...

Page 4: ...Outdoor Unit 8 3 1 Dimension of Outdoor Unit and Mounting Hole 9 3 2 Installation Space Requirement 9 3 3 Refrigerant Pipe Connection 9 3 4 Vacuum Pumping Refrigerant Adding 10 3 5 Electric Wiring 11...

Page 5: ...place with special requirements such as kitchen or washing room Otherwise it will affect the normal operation or shorten the service life of the unit or even cause fire hazard or serious injury As fo...

Page 6: ...terial fog dusk or moist 2 2 Outline Dimension and Installation Spots Equip with an inspection hatch after lifting the unit For the convenience of maintenance the service port should be on one side of...

Page 7: ...y using a nut and washer from upper and lower sides of the hanger bracket The washer fixing plate will prevent the washer from falling 4 The usage of paper pattern Refer to paper pattern of installati...

Page 8: ...e diameter of drainage pipe joint 3 Install drainage pipe according to the following fig and arrange insulation to the drainage pipe Improper installation may lead to water leakage and damp the furnit...

Page 9: ...ould be determined by the pressure of the drain hose Drain hose is in negative pressure state A B P 10 20 mm Drain hose is in positive pressure state A 30mm B P 10 20 mm NOTE P is the absolute pressur...

Page 10: ...nt air leakage The design and construction of air duct should comply with national requirements The edge of air return duct is suggested to be more than 150mm 5 7 8 inch away from the wall Add a filte...

Page 11: ...wered by independent circuit and specific socket 4 The wiring should be in accordance with related regulations in order to ensure the units reliable running 5 Install circuit breaker for branch circui...

Page 12: ...terminal H1 and H2 of indoor 4 bit wiring board 4 Fix the communication wire with wire clip on the electric box 5 Wiring instructions of remote receiving light board and wired controller Fig 15 2 6 3...

Page 13: ...tallation space Unit mm Fig 17 3 3 Refrigerant Pipe Connection NOTES Do not loosen the cap of the pipes when connecting the pipes between the indoor unit and the outdoor unit Connecting the pipes as s...

Page 14: ...he curving process should not be larger than 3 times in the same bending position During engineering installation the connection pipe inside the unit must be wrapped by insulation sleeve 3 4 Vacuum Pu...

Page 15: ...ing codes 2 Use air conditioner specialized power supply and make sure that it is consistent with system s rated voltage 3 Do not pull the power cord with force 4 All electrical installation must be p...

Page 16: ...wire to the following Water pipe Gas pipe Drain pipe Other places that are deemed as not secure by professional technicians 3 5 2 Wiring Diagram 1 Connection of power cord and communication wire Separ...

Page 17: ...king condition changes please adjust the specification according to national standard 4 Check Items After Installation and Test Operation 4 1 Check Items After Installation Check items Possible condit...

Page 18: ...ding refrigerant during test operation see below 7 After refrigerant is added make sure valves of outdoor unit are completely open 8 For the convenience of troubleshooting during debugging unit shall...

Page 19: ...varies from different type DIP switch SAI DIP switch varies from different cooling capcity before leaving the factory DIP switch is set for different models and fixed with glue The main control functi...

Page 20: ...over 5s to enter auto debugging 2 Exit project debugging After entering project debugging press SW3 button consecutively in the master module for over 5s to exit the debugging 3 Complete project debu...

Page 21: ...for Code and Operating Method Progress LED Display code Display status Start A0 Always ON No debugged yeat Press SW3 button consecutively in the master module for over 5s to enter auto debugging 01_M...

Page 22: ...l enter the next step 2s later 05_ Internal communication of outdoor unit 05 C2 Display repeatedly Communication error between master control and compressor drive Please check the connection between t...

Page 23: ...mong different modules are correctly connected 09 oC Display repeatedly Confirmation of valve status All modules are halted normally nixie tubes of all modules will display once circularly 10_ Debuggi...

Page 24: ...the filter NOTES If problem cannot be solved after checking the above items please contact Gree service center and describe the cases and models Following circumstances are not malfunctions Malfunctio...

Page 25: ...scharge temperature protection of compressor 1 F Main board of ODU is poor Malfunction of high pressur e sensor Malfunction of low pressure sensor Malfunction of discharge temperature sensor of compre...

Page 26: ...e shock No main IDU Power supply is insufficient 1 to more number of IDU is inconsistent 1 to more IDU series is inconsistent Alarm due to bad air quality Fresh air unit d Malfunction of exit tube tem...

Page 27: ...pressur e protection P Drive current detection circuit malfunction of compressor Low voltage protection of compressor s drive DC bus bar Phase lacki ng of inverter compressor Drive charging circuit ma...

Page 28: ...7 2 Drain Pipe Please check regularly whether drain pipe is blocked or not Make sure condensate can be drained out smoothly 7 3 Notice Before Seasonal Use 1 Check whether air inlets and air outlets o...

Page 29: ...uct the tests 8 After Sales Service If there s quality defect or other problems in the product please contact Gree local after sales service department for help Warranty must be based on the following...

Page 30: ......

Reviews: