48
Installation and Maintenance
Service Manual
11. Removal Procedure
09/12/18/21/24K
Motor and fan
Precondition: The power supply has been disconnected.
Step
Diagram
Operation Procedure
1.Remove the
line connecting
to the motor.
●Use a screwdriver to
unscrew
the electric box cover.
●Remove from the master board
the line connecting to the motor
and remove the tie.
2. Disassemble
the seal plate
and cover plate.
●Use a screwdriver to unscrew
the seal plate and cover plate
and then remove them.
3.Remove the
grille
●Use a screwdriver to unscrew
the cover plate component.
4. Remove the
centrifugal fan.
●Use a screwdriver to unscrew
the front volute casing and then
remove the volute casing.
5. Remove the
motor.
Remove the motor from the
support and remove the
centrifugal fan from the motor
axle. Then, remove the motor.
●For
motors
that
are
accompanied with supports, the
supports need removing as
well.
6. Install a new
motor.
●Assemble units based on the
reverse order of this procedure
and power on the units for test.
GREE ELECTRIC APPLIANCES, INC. OF ZHUHAI
Add: West Jinji Rd, Qianshan, Zhuhai,Guangdong, China, 519070
Tel: (+86-756) 8522218
Fax: (+86-756) 8669426
E-mail: [email protected] www.gree.com
HONG KONG GREE ELECTRIC APPLIANCES SALES LIMITED
Add: Unit 2612,26/F.,Miramar Tower 132 Nathan Road,TST,Kowloon,HK
Tel: (852) 31658898 Fax: (852) 31651029
For product improvement, specifications and appearance in this manual are subject to change without prior notice.