PL5500 PTO Pump Kit
Great Plains
| 411-774M | 2019
-
09
-
12
19
2. Secure the oil cooler (29) to the fan mount (20) using
four bolts (21), four washers (27), and four nuts (23).
3. Using a measuring tape and grease pencil, measure
5 in (13 cm) from edge of the oil reservoir and mark
the measurement.
4. Secure the fan mount (20) to the tongue about 5 in
(13 cm) behind the Oil Reservoir using two u-bolts
(28), four locking washers (26), and four nuts (12).
Install Hydraulic Hoses
The new hoses may be installed in any order. Secure the
hoses with any available clamps along their routes.
Remember there are three hydraulic hoses already
connected to the fan assembly. These hoses will remain
in placed and are necessary to install PTO pump
assembly kit. It is recommended to mark all hydraulic
hoses for convenience.
TP-71557
TP-71558
68689
841-196C
861-544C
861-544C