
2019-04-12
417-459M
NP2540
Operating Instructions
80
Field Operation Checklists
and “
” on page 78. The
applicator is presumed to be unfolded and raised.
Spill hazard/Tank damage risk:
Periodically check the tension of the straps for the fertilizer
tank. Strap tension will change as outside air temperature
changes. Adjust tension as necessary to prevent personal
injury or damage to the fertilizer tank.
These are merged anhydrous (NH
3
) and
conventional liquid (NH
3
) lists. NH
3
/NH
3
: refer to
material-specific operations. Some steps may refer
to Optional equipment.
First Pass Operation Checklist
Page
1
Raise fertilizer applicator.
1
Unfold, if not already unfolded.
2
Line-up at pass start per plan.
-
3
Pull forward and stop.
-
4
Check console
POWER switch ON,
BOOMS
a
switch(es) ON and
MASTER switch OFF
5
NH
3
: Re-check all line valves and bleed
valves closed.
6
NH
3
: Open tank withdrawal valve.
Check for zero releases.
7
NH
3
: Open applicator emergency shut-off
valve. Check for zero releases.
8
NH
3
: Open nurse tank hose inlet valve
(if any). Check for zero releases.
9
NH
3
: Open nurse tank hose outlet valve
(if any). Check for zero releases.
10
NH
3
: Open tank supply hose outlet valve.
11
NH
3
: Open applicator supply inlet shut-off
valve.
-
12
NH
3
: Check meter pressure gauge matches
tank pressure gauge.
13
NH
3
: Enter tractor cab.
Check ropes present with nominal slack.
14
Console (Option):
POWER on
MASTER on
RATE as desired
15
Lower applicator:
a. hitch (lower, then Depth Control)
b. cab switch to FIELD
c. wings (extend, then low rate
continuous extend)
16
Begin first pass, setting switch
MASTER to ON.
17
NH
3
: Hydraulic remote for hydraulic pump to
preset
18
Monitor the console (Option) for expected
reports of application rate/speed, and any
alarms.
-
19
Periodically check the applicator gauges for
expected pressures and temperatures.
-
20
Pay attention to odors. Watch for leaks.
-
a. BOOM 1, or BOOM 1,2,&3 (section control)
Pass Turn
a
Operation Checklist
Page
1
Set console MASTER switch OFF some
distance before end of pass, or stop at end of
pass.
21
NH
3
: To minimize vapor release, wait for flow
divider pressure gauge to read zero during
final pass distance or while waiting at end of
pass.
22
While slowing at end of pass, or stopped
-
23
b
Fold and lift (to partially fold wings)
Raise 3-point hitch
-
25
Turn up-wind if possible.
Turn slowly to avoid tank cart upset.
Do not turn too tightly.
26
Make turn. Line up for next pass.
27
Lower applicator (same as step 15) for First
Pass, at left.
28
Begin pass, setting switch
MASTER to ON.
29
Begin next pass
a. Monitor flow divider pressure during end-of-pass
operations and turns. Adjust operations as needed if true
zero pressure is desired.
b. These steps are for a full stop prior to a turn. If the lift is
conducted while in motion, the exact order of hitch and
lift-assist raising is not critical. The objective is to avoid
any reverse motion of tines.
First Pass Operation Checklist
Page