
Great Plains Manufacturing, Inc.
Setup 19
2019
-
10
-
17
160
-
037Q
9. Pin cylinder rods to cylinder mounts.
10. Recheck tractor hydraulic reservoir and fill to proper
level.
11. Perform a lift operation to raise openers. Set circuit
to Neutral to hold at lift.
12. At the center section remove four shipping
hangers that hold the center openers at raised
during shipment. These hangers are not re-used.
13. Slowly fold and unfold implement. Check for
hydraulic leaks. Be aware of any pinch points that
might cause damage or accelerate wear on hydraulic
hoses.
U
D
F
B
L
R
Figure 22
Pin Fold Cylinders
17192
1
Figure 23
Center Section Shipping Hangers
36023