
1205NT
Preparation and Setup
17
3/7/19
150-131M
Leveling Drill
Refer to Figure 8.
1. Loosen locknuts (2) and adjust cylinder eyebolts (1)
so there is initially about 3 1/16 inch of threads
above mounting plate.
2. Raise drill with hydraulics until openers and
coulters are 1 to 2 inches off the ground.
3. Measure height of coulter tube from ground on both
ends of drill.
4. Adjust eyebolt to level drill from end to end.
5. Tighten nuts on eyebolts when drill is level.
Figure 8
Jack Storage Position