![Great Little Trading Starbeans Coffee Shop Quick Start Manual Download Page 6](http://html1.mh-extra.com/html/great-little-trading/starbeans-coffee-shop/starbeans-coffee-shop_quick-start-manual_2259324006.webp)
6
Copyright© 2018 G.L.T.C. Ltd. All rights reserved.
Great Little Trading Company and GLTC are registered trade marks of G.L.T.C. Limited.
STEP 10:
Attach panel H to panel E using 2x barrel nuts and bolts.
Please do not fully tighten the barrel nut bolts, they need to be loosely
tightened to complete step 11.
STEP 12:
Secure panels G and H to panel D using 4x barrel nuts and
bolts.
Please also fully tighten the the barrel nut bolts
from step 6 and 10.
STEP 9:
Attach panel J to panel E using 1x screw (#4). At the same time, slot the dowels on
panel J into the holes on panel G.
STEP 11:
Slot panel K into the grooves between panels H and B. Now slot panel L into the
grooves between panels G and A.
Hardware for Step 12:
4x #1 barrel nuts
4x #2 barrel nut bolts
Hardware for Step 9:
1x #4 12mmL screws
E
J
Hardware for Step 10:
2x #1 barrel nuts
2x #2 barrel nut bolts
E
H
#2
#1
#2
#1
L
K
G
H
A
B
#2
#2
#2
#2
#1
#1
#1
#1
H
G
The assembly is now complete.
#4
G