13
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
2
STEP 21:
Attaching the doors.
Repeat step 20 for the LH door R.
Once all hinges are installed on both doors, you can check the alignment of the
door and adjust as required. Please see the adjustment guide at the end of these
instructions.
When happy, tighten ALL the hinge application screws.
R
#17
#17
#17
#16
#16
#16
STEP 20:
Attaching the doors.
Ensure that all the hinges are in the open position (as shown) on the RH Door S.
With the assistance of a second person to support the door, start at with the bottom
hinge and locate the 2 hooks on the hinge onto the front of the hinge raised section
of the hinge base plate (1). Once located in place, push down on the back of the hinge
until you hear a click to denote the hinge is latched in place (2).
Repeat process for each hinge working up the door.
S
#17
#17
#17
#16
#16
#16
NOTE: Steps 20 & 21 could be completed with the
wardrobe on it’s side with the door being fixed laying
on the floor with packaging underneath it to raise it to
the required level. This should still be completed with 2
people as it involves moving the whole wardrobe.