Great Lakes VRX Highlander Installation Instructions Manual Download Page 10

A

B

SIDE

SIDE

FOOT SUPPORT

FRONT

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A

A

B

B

C

C

D

D

VCMX INSTALLATION ON RACK

 6.  A. 

Loosen but do not completely remove the first 

M

10 bolt and star washer from the top of 4   

 

post rack as shown in Front Rack View.  

 

NOTE: Do not remove the bottom bolt!

 

 

B. 

Remove second M10 bolt and star washer from the bottom of 4 post rack as shown in 

 

 

Front Rack View. 

NOTE: Do not remove the bottom bolt!

 

 

7.

   Hook vertical cable manager through keyway holes onto the top bolt of the 4-post rack.

 

 

NOTE: Do not tighten any hardware until carriage bolts are in place.

 8.  

Secure the sides of the VCMX to rack with M6 carriage bolts, washers, and M6 nuts as    

 

 

shown in 

DIAGRAM H

 9.     

Reinstall bolt and star washer on bottom of frame through VCM  

10.   

Insert auxiliary foot support from inside of cable manager as show in 

DIAGRAM J

11.   

Tighten all bolts to secure vertical cable manager

Front Rack View

Loosen, but 

DO 

NOT REMOVE

 bolt 

and star washer

Remove Bolt and  

Star washer

DO NOT 

REMOVE

DO NOT REMOVE

DETAIL  A

TOP VIEW

DETAIL  B

BOTTOM VIEW

SECTION SIDE-SIDE

SCALE 0.11 : 1

FOOT SUPPORT DETAIL 

REFER TO STEP 4

FOR MORE DETAILS

.

A

B

SIDE

SIDE

FOOT SUPPORT

FRONT

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A

A

B

B

C

C

D

D

DWG NO:

REV

SHEET:

OF

DRAWN

CHECKED & APP.

TITLE

DRAWING NOT TO SCALE

PART NUMBER:

MATERIAL TYPE:

MATERIAL GAUGE:

FINISH:

GREAT LAKES CASE & CABINET CO., INC.

P.O. BOX 551 EDINBORO, PA 16412

PHONE (814) 734-7303 FAX (814) 734-3907

E-MAIL [email protected]

Use of this document is subject to

a confidentiality and nondisclosure

agreement with Great Lakes Case

& Cabinet Co., Inc. (GLCC) and may

not be reproduced, disclosed or

utilized in whole or in part without

prior written authorization from GLCC.

NOTICE:

TOLERANCE UNLESS OTHERWISE NOTED:

A/- 1

.XXXX +/- .010

.XXX +/- .015

.XX +/- .030

 .X FOR REF. ONLY

UNLESS OTHERWISE SPECIFIED

ALL DIMENSIONS ARE IN INCHES

DIMENSIONAL LIMITS APPLY

AFTER APPLICATION OF FINISH

INTERPRET DRAWING PER ASME Y14.5M-1994

THIRD ANGLE

PROJECTION

DATE

DATE

0

VL

2/20/2020

 

 

MS-5.02-67 REF

VCMXxxUxx

 

 

 

RECESSED 45U X 10"W VERTICAL CABLE

MANAGER ASSEMBLY INSTRUCTION

EST. WEIGHT : 

N/A

REVISION HISTORY

REV

DESCRIPTION

DATE

APPROVED

0

-

2/20/2020

VL

REF DRAWING - 

SPECIAL NOTES:

 

1)  TYPICAL BEND RADIUS = R0.030 x 90° INSIDE UNLESS

     OTHERWISE NOTED. 

2)  DIMENSIONS APPLY BEFORE APPLICATION OF FINISH:  ADD 

     .005" TO EACH SURFACE FOR INSPECTION.   

3)  ALL LASER CUTS TO HAVE "NORMAL" PROCESSING

!

4)  PREPARE THREADS PRIOR TO WELDING OR POWDERCOAT

     PER TD-09-109.

5)  FINISH PER TD-09-103 (POWDER COAT), CLASS B, TEXTURE 

     LEVEL 3, ALL SURFACES UNLESS OTHERWISE NOTED.

NOTE!

WHEN THE FOOT SUPPORT IS

INSTALLED ON THE OUTSIDE OF RACK

AS SHOWN, THE SHIM PLATE MUST BE USED

REFER TO STEP 4 FOR MORE DETAILS

.

FOOT SUPPORT SHOWN

ON OUTSIDE OF RACK,

SHIM PLATE MUST BE USED

ON TOP MOUNTING HOLE

SEE STEP 

4.A

 FOR REFERENCE

FOOT SUPPORT

SHOWN ON 

INSIDE OF RACK,

SHIM PLATE MUST

BE OMITTED

SEE STEP 

4.B

FOR REFERENCE

I032015

1.A.

LOOSEN, BUT DO NOT REMOVE 

1st 1/2-13 BOLT & STARWASHER

FROM TOP OF 4-POST RACK AS SHOWN

1.B.

LOOSEN, BUT DO NOT REMOVE 

2nd 1/2-13 BOLT & STARWASHER

FROM TOP OF 4-POST RACK AS SHOWN

DO NOT REMOVE

DO NOT REMOVE

REMOVE BOLT 

AND STAR WASHER

LOOSEN, BUT

DO NOT REMOVE BOLT 

AND STAR WASHER

1/2-13 HEX BOLT

1/2 STAR WASHER

1/4-20 CARRIAGE BOLT

1/4" FLAT WASHER

1/4-20 NUT

AUXILIARY FOOT

10

Summary of Contents for VRX Highlander

Page 1: ...1 866 879 4522 GreatCabinets com 5 5 6 6 7 7 8 8 A B C D 3 VRX Highlander Variable Depth Racks Metric Installation Instructions...

Page 2: ......

Page 3: ...EFORE ASSEMBLY PLEASE SEE PAGE 14 FOR SAFETY CONSIDERATIONS INSTALLATION RECEIVING UNPACKING AND REMOVING THE RACK Inspect and report damage before receiving Unpack the rack by carefully removing the...

Page 4: ...tions UL2416 Listed Construction Vertical Uprights 12 ga steel Cross Members 14 ga steel Extension Bars 12 ga steel Bottom Width Brackets 12 ga steel Top Width Brackets 14 ga steel Finish Steel White...

Page 5: ...Upright Top Width Bracket Bottom Width Bracket When assembled a cross member and extension bar create the variable depth cross member assembly Diagram E see page 8 Front Extension Bar Rear Cross Memb...

Page 6: ...T BOTTOM RIGHT DETAIL FBL FTR FRONT BOTTOM LEFT FRONT TOP RIGHT DETAIL RTL RBR REAR TOP LEFT REAR BOTTOM RIGHT D R R 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A B C D Single Hole ETAIL FTL FBR RONT TOP LEFT RONT BO...

Page 7: ...t and nut in square hole between tabs shown in DIAGRAM D Once the cross members and extension bars have been assembled the variable depth cross member assembly can be mounted to the uprights see DIAGR...

Page 8: ...0 x 20mm lg Hex Head Bolt M10 Ext Tooth Washer M10 Ext Tooth Washer M10 Nut Plate DIAGRAM F M10 Ext Tooth Washer 2 Assemble top width brackets to vertical uprights DO NOT TIGHTEN DETAIL E SCALE 75 DET...

Page 9: ...rdware is Great Lakes Seismic Anchor Kit AK101 or HDW 4 FLMT M For other floor construction the installer must provide all appropriate hardware DIAGRAM G 75 Four locations TOE IN RACK DEPTH MINUS 2 22...

Page 10: ...the top bolt of the 4 post rack NOTE Do not tighten any hardware until carriage bolts are in place 8 Secure the sides of the VCMX to rack with M6 carriage bolts washers and M6 nuts as shown in DIAGRAM...

Page 11: ...3 4 5 6 7 2 3 4 5 M6 Carriage bolt Flat Washer M6 Nut M10 Hex Bolt Loosen but DO NOT remove Star Washer Rack DIAGRAM H Auxiliary Foot DIAGRAM J VCMX INSTALLATION ON RACK CONTINUED 11...

Page 12: ...in locations as shown 12 Top cable waterfall must be installed after installing VCMX Secure both front and back waterfalls with M6 carriage bolts star washers and nuts as shown in Diagram J DIAGRAM K...

Page 13: ...l If these parts need to be bonded to the protective earthing terminal do so in accordance with Article 250 of the National Electric Code Although equipment may physically fit into a Great Lakes rack...

Page 14: ...viest equipment first at the bottom of the ER Rack and load the lighter units at the top Only UL Listed ITE Information Technology Equipment units should be installed inside the rack Be sure to read a...

Page 15: ......

Page 16: ...FORM MS 5 02 64HL M Rev 5 Thank you for your business ETSI Associate Member...

Reviews: