background image

STEP #1:

 

Install top angles 

to vertical upright 

channels.

A. 

Lay vertical 

upright channels 

on edge so 

tapped holes face 

you and the floor. 

Be sure open 

sides of upright 

channels face 

each other.

B. 

Align holes 

in top angle with 

corresponding holes in vertical uprights. Formed leg of top angle 

should be facing toward you.

C.

 Install 2 hex head bolts and lock washers. Finger tighten only.

D.

 Turn vertical upright assembly over (rotate 180 degrees) and 

repeat steps B and C. Finger tighten only.

 

 

 

 

 

 

 

  

 

 

  

 

  

 

  

 

  

 

  

 

  

       

 

  

 

  

 

 

  

 

  

   

 

  

 

   

   

 

   

   

 

 

 

 

 

 

 

 

 

 

   

   

 

 

   

 

 

   

 

 

 

   

   

 

   

   

 

     

 

 

 

 

 

 

 

 

   

 

 

 

 

 

   

 

   

   

 

 

STEP #2:

 

Install base angles 

to vertical upright 

channels.

A. 

Leaving vertical 

upright channels 

on edge, align 

holes in base with 

corresponding holes 

in each upright 

channel. Long leg 

of base should be 

facing you.

B. 

Install 4 hex 

head bolts and lock 

washers. Finger tighten only.

C. 

Turn vertical upright assembly over (rotate 180 degrees) and 

repeat steps A and B. Finger tighten only.

 

 

 

 

   

 

 

   

 

   

 

 

 

 

   

 

 

 

 

 

 

Reviews: