background image

11

COPPER BUS BARS

It is important to note that grounding the cabinet does not ground the 

equipment mounted within it. In order for any individual devices and 

components mounted within an cabinet to be grounded, they must be 

connected to a copper bus bar. Available copper bus bars include:
•  CBB-19 Copper Bus Bar for 

  19" rack mounting (Isolated)

•  CBB-48 Copper Bus Bar for 

  48"H and 60"H Cabinets (Isolated) 

ACCESSORIES

REMOVABLE TOP PANELS

Part No.  

Description 

TPE-24F  

Top panel and fan assembly

TPE-24F10  

Top panel & fan assembly w/550 CFM 10" fan

TPE-24S  

Solid top panel with (2) 4" horseshoe knockouts

TPE-24P 

Perforated top panel with (2) 4" horseshoe knockouts

STATIONARY SHELVES FOR 19" MOUNTING

Part No.  

Description

7206-FR-AHD  

Front & rear mount, adjustable - 17.50"W x 22.25"D

7206-FR-ADHD  

Front & rear mount, adjustable - 17.50"W x 27.25"D

7206-FR-A28HD  Front & rear mount, adjustable - 17.50"W x 28.00"D

SLIDING SHELF FOR 19" MOUNTING

Part No.  

Description

7206-FRSL-AHD   Front & rear mount sliding adjustable - 17.50"W x 22.00"D

7206-FRSL-ADHD  Front & rear mount sliding adjustable - 17.50"W x 26.00"D

COOLING EQUIPMENT & NETWORKING HARDWARE

Part No.  

Description

7217FT  

Fan tray with three 75 CFM fans

7217FT-3  

Front & rear mount, adjustable fan tray w/3, 75 CFM fans

G101  

Networking hardware

Visit our web site at 

GreatCabinets.com

 for a complete list of available 

accessories.

Summary of Contents for GL300E-2432

Page 1: ...the following Great Lakes cabinets GL300E 2432 GL480E 2432 GL600E 2432 GL300E GL480E and GL600E E Cabinets Installation Instructions UL60950 1 UL2416 E Series Equipment Cabinet Rack 1 866 879 4522 Gr...

Page 2: ...the E cabinet could result in equipment damage serious injury or possible death Only trained service personnel should be used to remove the cabinet from the pallet Also be sure you have a sufficient n...

Page 3: ...nd M6 screws This user s manual This user s manual applies to the following GL cabinets Part No H W D RMU Weight Cap GL300E 2432 30 24 32 13 300 lbs GL480E 2432 48 24 32 24 600 lbs GL600E 2432 60 24 3...

Page 4: ...nets before installation Sudden stops and starts excessive force obstructed routes and uneven floor surfaces may cause the cabinet to topple over Loading Equipment WARNING Only install equipment after...

Page 5: ...cept the same key The swing handles and doors are reversible The exploded view shows its construction DOOR REMOVAL AND ATTACHMENT Open the door beyond 90o grasp the door with both hands and carefully...

Page 6: ...NGE MOUNTING SIDE PANEL REMOVAL The side panels are secured to the cabinet frame with two quick release latches and a keyed lock Be sure to unlock the side panel To remove the side panel squeeze the q...

Page 7: ...adjust the leveling glide down Note If you want to use casters AND leveling glides you will need 4 levelers ANCHOR MOUNTING THRU HOLE The middle 687 dia thru holes are for securing the cabinet to the...

Page 8: ...BOTTOM PANELS There are several styles of bottom panels available solid is shown Styles must be ordered separately All styles mount to all cabinets The bottom panels have a foam gasket to ensure a po...

Page 9: ...0E cabinet comes with 7219 powerstrip for 19 mounting MOUNTING RAILS The vertical mounting rails 2 pair 12 Ga steel come installed with all standard Great Lakes cabinets at 19 EIA spacing universal mo...

Page 10: ...it Ground Connect the dedicated branch circuit ground connector to the main protective grounding stud located inside at the bottom rear of the cabinet frame using a listed ring or closed loop terminal...

Page 11: ...horseshoe knockouts TPE 24P Perforated top panel with 2 4 horseshoe knockouts STATIONARY SHELVES FOR 19 MOUNTING Part No Description 7206 FR AHD Front rear mount adjustable 17 50 W x 22 25 D 7206 FR...

Page 12: ...FORM MS 5 02 27 REV 2 ETSI Associate Member ISO 9001 2015 Registered ISO 9000 2015 Thank you for your business...

Reviews: