INSTALLATION AND OPERATION
The work area should be well ventilated.
Provide adequate lighting in the work area to allow observation of the cleaning process and the floor area
around the machine. Be sure to allow adequate room to bring work to and from the machine. Provide
sufficient clearance around the machine for fluid changeovers and servicing.
Site Preparation
Before installing, careful consideration should be given to the place of operation. Place unit on a smooth,
level surface. To the extent possible avoid installing machine in areas subject to high forklift traffic.
Reasonable precautions shall be taken to avoid damaging the legs and tank walls.
MODEL
A
B
C
D
E
F
G
MAX
MIN
PL364
36
’’
22
’’
60.5
’’
28
’’
21
’’
16.25
’’
39
’’
4.
5”
2.5
’’
PL424
42
’’
38''
20.25”
8”
4.5”
MODEL NO.
FLUID CAPACITY
MAX LOAD CAPACITY - SHELF/FLOOR
PL364
5-15 GAL
100/300 LBS
PL424
18-34 GAL