9
ATP-2000
User Guide
Connections
All necessary rack connections to the unit are made to the left-hand side and right-hand
side of the unit. (See Figure 2-4.)
1 Connect an Ethernet network cable to “LAN” with a DHCP service enabled. (See
2 Connect the DC power lead from the power supply unit to “DC 12 V”. (See Figure 2-4c.)
Fig. 2-4: ATP-2000 Connections
3 Connect the power supply unit to an AC mains supply.
4 Apply AC power.
Connectors, Controls, Interfaces
, on page 55 in Appendix C, for
connector details.
Note: The ATP-2000 unit needs to be connected to the same
‘control/management’ network as the GV Orbit server(s).
c) Connect DC Power Lead from Power Supply Unit to “DC 12V”
a) ATP-2000 Rear View
“
LAN
”
“
DC 12V
”
b) Connect Ethernet Cable to “LAN”
CAUTION Do not make any other connections to the unit.
Summary of Contents for ATP-2000
Page 1: ...User Guide 13 03082 230 AA 24 November 2020 ATP 2000 ADVANCED TOUCH PANEL ...
Page 4: ...iv Notices ...
Page 21: ...xxi Table of Contents ...
Page 25: ...4 Introduction This Document ...
Page 41: ...20 Getting Started Configure Initial Settings in the Control Screen ...
Page 47: ...26 ATP 2000 Control Screen Web Page ATP 2000 Control Screen Web Page ...
Page 67: ...46 Maintenance Replacing the Battery ...
Page 73: ...52 Hardware Specification External Connectors ...
Page 75: ...54 Unit Dimensions ...
Page 80: ...59 Power Supply Unit Power Supply Unit DC Power Supply Module 60 Physical 60 Electrical 60 ...
Page 89: ...68 Battery Replacement Step 6 Re Install in Rack ...