
8943FC — Instruction Manual
17
Installation
Fiber Channel 1 and 2 SFP Device and Fiber Cable Installation
Note
Before making any fiber connections, refer to the
.
After preparing the SFP devices for installation, install the Receiver SFP
devices required for the Fiber Channel 1 and Fiber Channel 2 outputs as fol-
lows:
Note
This example uses a dual fiber receiver that will receive frequencies from
1270 to 1610nm as shown in
.
1.
Remove the black rubber dust cover from the SFP device and clean the
fiber faces of both the SFP device and connector J6 as described in
2.
Align the SFP device with the right angle bottom SCA-2 connector (J6)
and the mounting screws on the 8943FC module (
).
3.
Loosen the two screws slightly (do not remove them completely) with
a torx screwdriver so the mounting bracket straps can slide under the
screws.
4.
Slide the SFP device towards the SCA-2 connector so the electrical
connector on the SFP device engages with the SCA-2 connector and the
straps are underneath the two screws.
5.
Tighten the screws to secure the SFP device to the front module.
Figure 8. Installing F1 and F2 SFP Devices
Now install the fiber cable assembly from the SFP device to the rear con-
nector as described below.
1.
Remove the dust covers from the fiber cable assembly connectors to
expose the LC ferrules (the ends of the fiber optic cable).
Slide bracket straps
under screws
and tighten.
SCA-2
connector, J6