background image

B

RAFTERS

2

C

RAFTERS

7

D

CURVED
BEAM

2

1. The Structure is spaced to allow standard 

Grange panels to be inserted, if preferred, to 
provide a screen. The distance between each of 
the posts is therefore 1830mm (see 

Fig.1

).

2. The curved Beams (D) have to be fixed to the 

Rafters (B). Mark the centres of the Rafter and 
the Curved Beam and line up before fixing the 
Curved Beam with screws (

x

) (see 

Fig.2

).

3. Once this has been done, mark out the points 

where the remaining rafters (C) will be fixed. 
Two of the Rafters will locate in the top of the 
posts to form a square structure. Therefore, two 
points between the centre and the morticed 
point need to be marked.

4. Beginning with two Posts for the front of the 

structure, position them where they will be 
fixed. Do 

NOT

fix at this point.

5. Next, insert one of the Rafters with a Curved 

Beam attached into the tops of the Posts (

Fig.3

).

6. The side Rafters locate within the tops of the 

Posts and the Rafters with the Curved Beams 
attached.

7. Locate the side Rafters into the assembled end 

section, resting the free ends on the ground.

8. Assemble the other two Posts with a Rafter and 

Curved Beam.

9. Locate the free ends of the side Rafters into the 

Posts to create a square structure.

10.Fix the four corner points with screws (

x

).

11. Fix the remaining five Rafters at the points 

previously marked starting at the centre.

12. Ensure the structure is vertical and square 

before fixing the Posts in place (see 

Fig.4

).

CONTEMPORARY PERGOLA

ASSEMBLY INSTRUCTIONS

Ref.

CROSS HEAD SCREWDRIVER

PARTS SUPPLIED

TOOLS REQUIRED

(not supplied)

Description

Qty.

A

POSTS

4

X

SCREWS

18

1x

HARDWARE PACK & ACCESSORIES:

BEFORE YOU START

Check the pack/s and make sure that you have 
all of the parts listed above. If not, contact 
your retailer who will be able to help you.

When you are ready to start, make sure you 
have the right tools to hand, plenty of space 
and a clean, dry area for assembly.

It is advisable for two people to carry out 
the work.

SITE PREPARATION

Excavate a 300mm square
hole (approx) for each
post to a depth of at least
300mm. (see Fig.A.right)

We would recommend
that you use 

MetCrete

,

fast set post fixing
concrete to fix your posts.
Easy to use, it sets in just
10 minutes.

ASSEMBLY

Fig A.

3

0

0

m

m

Fig 2.

B

C

D

A

=

=

=

=

=

=

=

=

x

x

x

B

A

C

Fig 3.

Fig 4.

x

x

To ensure longevity of your structure it is
recommended that it is treated with a wood
preservative on a yearly basis.

AFTERCARE

Contemporary Pergola Inst  8/7/11  09:59  Page 2

Reviews: