Grange BOWED WALKWAY Quick Start Manual Download Page 2

192.5cm

192.5cm

BOWED WALKWAY PERGOLA PLAN

1

5

0

.5

cm

1

6

0

cm

183cm

183cm

A

A

B

B

C

D

E

F

BEFORE YOU START

Please ensure that you check all the component parts for quantity and quality before you 
commence building the product. Report any missing parts immediately. The manufacturer will 
not accept any responsibility for damaged items once any part of the product has been fitted or 
altered in any way.

Timber is a natural material and will react to varying levels of moisture content - ie. will swell or 
shrink. All of the Timber components are pressure treated green. However, should extra 
protection be required, they should be treated using a wood preservative treatment, following the 
manufacturers instructions.

HEALTH AND SAFETY

Do not lean or stand on the roof assembly at any time - the structure is not of a load bearing design.
Do not overstretch when working from the step ladder.
In order to reduce the risk of suffocation please keep all plastic bags and small parts away from children.

When you are ready to start, make sure you have the right tools to hand, plenty of space and a 
clean, dry area for assembly. 

It is recommended that two people erect the structure.

Thank you for choosing this garden structure from Grange. In order to gain the most
benefit from it please read the following instructions carefully.

TOOLS REQUIRED

(Not Supplied)

POWER DRILL
(+ crosshead screwdiver bit)

SPIRIT LEVEL

TAPE MEASURE

STEPLADDER

SQUARE

PARTS LIST

TIMBER POSTS

6

CURVED BEAMS

3

RAFTERS

10

BRACKETS (SHORT)

10

BRACKETS (LONG)

5

HARDWARE PACK

SCREWS   No.10 x3”

12

SCREWS   No.8 x 1.25”

60

ASSEMBLY INSTRUCTIONS

STEP 1

Using the layout shown above mark
out the area where the structure is to
be sited.

STEP 2

Prepare the holes for the posts (

1

).

Each hole should be a minimum of
30cm deep. Make sure the depths are
the same to ensure the structure is
level when all the posts are sited.

Allow adequate room for the preferred
method of fixing (ie. Carlton FP-Ecofix).

STEP 3

Site posts 

A

and

B

into the prepared

holes. Ensure the correct orientation of
the cutouts and that the posts are the
same height and upright.

Note: Posts must be fixed before
attempting to complete build.

STEP 4

Take one of the Curved Beams (

2

) and

place it into the top of the posts. Make
sure the overhang is equally spaced. 
Fix in place with two screws (

y

) in each

post.

STEP 5

Repeat steps 3 and 4 for posts 

C

and 

D

.

STEP 6

Fix five of the smaller brackets (

w

) to

the Curved Beam (

2

) at posts 

AB

at

equally spaced intervals using screws
(

z

).

(continued overleaf)

3

2

1

y

z

2

3

w

x

z

y

3

0

cm

=

STEP 2

STEP 1

1

B

A

D

C

STEP 3

STEP 4

STEP 5

y

z

z

y

1

1

1

2

1

2

w

2

2

STEP 6

=

=

=

=

=

w

x

BWALK [A5 4page instructions]  4/2/16  10:22  Page 2

Reviews: