background image

Thank you for choosing this garden structure from Grange Fencing Ltd. In order to gain the most benefit
from it please read the following instructions carefully.

PLEASE READ THE ASSEMBLY INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING TO ERECT THE STRUCTURE.

THE STRUCTURE IS FOR THE MORE ADVANCED DIY PERSON.  

ESTIMATED BUILD TIME - 10-12 HOURS (over two days).

TOOLS REQUIRED

(Not Supplied)

POWER DRILL
(+ crosshead screwdiver bit)

SPIRIT LEVEL
TAPE MEASURE
STEPLADDER
SCISSORS OR STANLEY KNIFE
HAMMER

POSTCRETE (for 4 posts)

PARTS LIST

TIMBER POSTS

4

RAFTER (LOWER)

2

RAFTER (UPPER)

2

APEX RAFTER

1

CURVED BEAM

8

CURVED SUPPORT BEAM

2

(LEFT HAND)

CURVED SUPPORT BEAM

2

(RIGHT HAND)

CURVED FASCIA BEAM

2

(LEFT HAND)

CURVED FASCIA BEAM

2

(RIGHT HAND)

ROOF CENTRE SLATS        2x 16

(2 SETS)

ROOF END SLATS              2x 16

(LEFT HAND SIDE - 2 SETS)

ROOF END SLATS              2x 16

(RIGHT HAND SIDE - 2 SETS)

CENTRE SUPPORT SLATS

6

END SUPPORT SLATS

4

SOFFIT BOARDS

2

SHINGLES PACKS

4

EAVES SHINGLES PACK

1

HARDWARE PACK

NAIL PLATE

8

SCREWS - 10 x 3”

8

SCREWS - 8 x 2”

32

SCREWS - 6 x 1.5”

16

NAILS

500

CLOUT NAILS

300

SCREWS - 8 x 100

8

(TURBO COACH SCREWS)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

t

u

v

w

x

y

z

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

t

u

v

w

x

y

z

Summary of Contents for TEA HOUSE PERGOLA

Page 1: ...l 01952 588088 Fax 01952 581522 Email sales grangefen co uk Web www grangefen co uk 3 36m 2 63m TOP VIEW ALL PRODUCTS ARE MEASURED TO THE HIGHEST AND WIDEST POINT AND ALL SIZES ARE APPROXIMATE By buyi...

Page 2: ...for 4 posts PARTS LIST TIMBER POSTS 4 RAFTER LOWER 2 RAFTER UPPER 2 APEX RAFTER 1 CURVED BEAM 8 CURVED SUPPORT BEAM 2 LEFT HAND CURVED SUPPORT BEAM 2 RIGHT HAND CURVED FASCIA BEAM 2 LEFT HAND CURVED...

Page 3: ...and small parts away from children When you are ready to start make sure you have the right tools to hand plenty of space and a clean dry area for assembly Two people are required to carry out the wor...

Page 4: ...Take the Apex Rafter 4 and mark the position for the curved beams Measure from the centre STEP 11 Position one of the curved beam assemblies across one of the Rafters 3 as fig 6 STEP 12 Locate the Ape...

Page 5: ...ed end to the apex beam 345mm from the curved beam Use two screws v to fix the lower end to the Rafter 3 STEP 21 Repeat the procedure for the remaining three support beams ROOFING The structure is now...

Page 6: ...ne of the eave shingles and align the centre with the centre marked on the roof An overhang of 30mm should be allowed at the edge of the roof Remember to peel off the protective plastic on the back of...

Page 7: ...shingles and equally spaced either side of the apex Use two Clout Nails y to fix it in place on the side where the next shingle will cover them Remember to remove the protective plastic from the back...

Page 8: ...k when humidity rises It is nature at work and not considered a fault Its colour will also change with time A retreatment as required with a proprietary wood treatment is recommended CARE OF YOUR TEA...

Reviews: