Grandview Liberty Flash Series Instruction Manual Download Page 2

Screen structure

Decorative frame

11mm

7mm

32

.

7mm

I

/a-c

I

/d

III

/a

-

b

III

/c

-

d

III

/e

Centere

d

1

2

3

4

5

6

7

8

9

10

11

12

Front view

Back view

S

id

e v
ie

w

Partial section view

Mounting

Brackets

Attached disc

Thin Bezel Frame

 Brackets

Thin Bezel

Frame 

Brackets

Screw

nut

Tension

rod

Material

Springs

Inner 

frame

Decorative

 frame

P

ro

je

c

tio

n L

ig

h

t

Screen

Screen component

Please check whether the screen components are complete before assembly; some screws and accessories are
available in order to replace them after damage during installation.

Screen Frame & Frame Bezels 

(2 short, 2 long each)

Corner Brackets

 

(8)

Screen Material (1)

Tension Rods 

(2 short, 2 long each)

Protective Sheet (1)

Spring Tool (2)

Sliding Nuts [installed] (14)

Material Springs [installed] 

* Extra Springs included in 

the hardware pack (4)

Thin Bezel Frame 

Brackets (10)

Gloves (2 Pair)

Mounting Brackets (2)

 

Magnets

 (2)

 

Attached disc (2)

M5x8mm Magnet

Mounting Screws (4)

Screen assembly method

I. Inner frame connection method

a. Gloves  should  be  worn  before  installation. After  cleaning
the site, the pearl cotton film is distributed on the bottom pad.
Four long and short inner frames are placed into a rectangle.

b. Check  that  the  number  of  tension  spring  assemblies  and
sliding nuts pre-assembled in the inner frame is correct. The
number of sliding nuts is 5 for each long frame and 2 for each
short frame. The number of conventional size tension spring
assemblies  is  shown  in  the  table  below.  If  it  is  found  to  be
missing, please make up enough.

c. The  Corner  Brackets  are  respectively  inserted  into  the
upper and lower          shaped grooves of the four right-angled
inner  frames,  and  fasten  by  the  M5X6mm  corner  screw  one
by one angle is 90°.

d. Adjust the border to full alignment and tighten the screws
to complete the inner frame connection. This step will affect
the  appearance  of  the  bezel  frame,  please  be  patient  for
perfect matching. 

II . Screen installation

I

a. The tension rods side's up and tiled on the screen (note that
the site is cleaned, and there is no raised object on the bottom).
The front side of the frame is placed on the screen with the front
side  facing  down,  and  the  long  and  short  tension  rods  are
respectively inserted into the corresponding curling holes inside,
ensure that the exposed ends of the tension rods are all equal
in length.

b. Adjust the relative position of the frame and the screen to make it
centered symmetrically for easier installation. Note: The inner frame
edge is sharp, so be careful when moving to prevent cutting your hand
or cutting the screen.

c. Use  the  spring  tool  to  hook  the  small  round  hole  on  the  tension
spring, and drag all the tension spring assemblies to the corresponding 
screen holes to prepare the installation screen.

d. Fold the screen edge, pull the tension spring with the spring tool,

 

and

hang the tension rods in the hole of the screen; it is recommended to 
hang the 2-3 tension springs in the middle of the four sides, adjust the 
position of the screen to center, then hang the position of the four corners,
and finally hang up all the remaining springs .

e. If  wrinkles,  waves  are  present,  the  reason  is  that  the  screen  is  not
completely tight, you can gently adjust it from the middle to the outside until
the four corners of the screen completely cover the border.

Precautions:

1. When  you  purchase  a  PVC  elastic  soft  screen,  because  the
material of the screen is shrinkable, the size of the screen will be
reduced after a long time, and it can be appropriately elongated
during installation.

2. If the force is too large when hanging the spring, it will cause
permanent deformation. If the tension spring fails, please replace
it in time.

Screen

Wrong

Screen

Right

equal

length

Qty. of Pre-assembly Springs

92

 

12

7

100

 

12

7

106

 

14

8

110

 

14

8

120

 

14

9

Screen size

16:9/16:10

Each long sides

Each shot sides

adjust

M5x50mm Phillips Head Screws

& Concrete Anchors (6)

Black Covering Cloth

 (only for AW6 acoustic

weaved fabric)

Transparent PVC pressing

strip long and short each 2pcs

 for horizontal and vertical

frame (To fix the black cloth)

M5x8mm Bracket Mounting Screws (4)

M5x6mm Corner Screws (46)

Inner

frame

II

/a

-

c

I . Black 

c

overing 

c

loth 

i

nstallation

I

If  you  are  purchasing  this  product  with AW6  acoustic  weaved
fabric, before you install the projection fabric, please install the
black cloth first to block the reflection of the projection light onto
the frame metal surface. Detail as below:

a. Lay the fabric flat, then put the installed screen frame onto the
black cloth center

.

b. Fold up the black cloth from four sides and use the          

shape

PVC pressing strip (the L shape locking leg outward as in II/a
-c) to press down the black cloth into the         shape frame
notch for stabilization.

c. Adjust the black cloth until it fits

.

Facing

outward

Black

covering

cloth

Press down

Reviews: