3
4
5. Double align Fixing lugs with arrows. Using the Tensioning bar, pull fabric eyelets over Fixing lugs by your
hands clockwise (Tips: arrange Horizontal tensioning bars first then Side tensioning bars). (Figure 11-15)
6. There is locking system on the Bottom bracket but no on the Top backet, brackets' length are at half of
Horizontal frames'. And there is 5 groups of holes on each brackets with 10cm distance, each group has
3 holes at 5 8 & 6 from left to right. Brackets are suggested to mount at the middle point of frame with
only 30% fluctuation if needed. (Figure 16)
Up bracket
Bottom bracket
Secure button
10CM
10CM
7. According to AA distance list on first page, mount two brackets onto the wall separately, assure they are at
horizontal level. (Figure 17-18)
Up bracket
Bottom bracket
AA
4. Unfold screen fabric and insert 4 Tensioning bars seperately into 4 different fabric grooves, be careful not
to poke the fabric. (Figure 8-10)
Figure 8
Figure 10
Figure 9
5mm Tensioning
bar
Figure 11
Figure 12
Figure 13
Figure 14
Figure 15
Figure 16
Figure 17
Figure 18
Here below are the mounting details:
a) Wood wall mounting: to fix the brackets onto the wall using 4 provided Wooden screws 5 x 40, two screws
for each brakcet. (Figure 19)
b) Concrete wall mounting: to use an electric drill to drill 4 holes ( 2 holes for each bracket), and hammer the
provided tapping anchors into each hole, then fix the brackets onto the wall by fastening the tapping screws
to the tapping anchors. (Figure 20)
Figure 19
Figure 20