
OPERATING THE CRAFT
44
Begin the inflation procedure according to the sequence shown in figure 9. Initially, partially inflate
each chamber (approx. 0.1 bar (1.45 psi) then repeat the procedure inflating each chamber to its
nominal pressure, 0.15 bar (2.15 psi).
The nominal pressure is 0,15 bar (2,15 psi).
Fig. 9. Tube inflation sequence.
Check the pressure in each chamber with a pressure gauge. If you do not have a pressure gauge
the following procedure will serve as a guide. Press a finger firmly against the tube – if the tube is
depressed by about 10 mm (⅜ inch) this indicates that the pressure is approximately correct.
After the tube chambers have been inflated to the nominal pressure replace the valve caps. Fit the
caps to the valve body and turn clockwise until secure.
Summary of Contents for Golden Line G240
Page 1: ......
Page 2: ...CONTENTS...
Page 3: ......
Page 4: ...4...
Page 84: ...TECHNICAL DETAILS 84 GENERAL VIEW OF A BOAT Fig 39 General view of a boat...
Page 86: ...TECHNICAL DETAILS 86 ELECTRICAL SCHEMATIC DIAGRAM Fig 41 Electrical schematic diagram...
Page 100: ...FOR YOUR NOTES...
Page 101: ......
Page 102: ......