
1
TABLE OF CONTENTS
1.0
IMPORTANT SAFETY ADVICE
2
2.0
APPROVED APPLIANCE
3
3.0
INSTALLATION REQUIREMENTS
3
4.0
CO-AXIAL VENT INSTALLATION PROCEDURE
5
5.0
INSTALLATION CONSIDERATIONS
5
6.0
DIRECT VENT RECOMMENDATIONS
6
7.0
TERMINAL INSTALLATION
6
8.0
FLUE PIPE ADAPTER INSTALLATION
9
9.0
FLUE PIPE CONNECTION
12
9.1
CONNECTION TO APPLIANCE
12
9.2 CONNECTION TO TERMINAL
12
10.0
COMBUSTION AIR PIPE INSTALLATION
13
11.0
PRESSURE SAFETY SWITCH INSTALLATION
13
12.0
PRESSURE SWITCH WIRING CONNECTION
15
12.1 KLR, KLF & KHM CONNECTION
15
12.2 CAST IRON BOILER B*C CONNECTION
15
13.0
HEATING UNIT BURNER SPECIFICATIONS
16
14.0
START-UP INFORMATION
18
14.1 START-UP PROCEDURE
18
14.2 COMBUSTION TEST
18
15.0
EXPLODED PARTS VIEW
19