1.6 RESTARTING 

BOILER 

 

Follow this procedure before restarting a unit that has been shut down for an extended period. 

 

INSPECTION 

Have the boiler/system serviced and inspected by a qualified technician. 

 

FUEL 

Turn on fuel supply and check that there are no leaks. 

 

POWER 

Turn on power switch and check that the boiler starts and operates as usual. 

 

OPERATION 

If the boiler/system fails or operates in an unusual manner call your service 
technician.  If the burner fails to operate at any time, call a qualified burner 
technician. 

 

2.0

 

INSTALLATION

 

 

2.1 IMPORTANT

 

 

Read owner’s manual before installing boiler or lighting burner.  Consult local authorities if in 
doubt about local fire safety regulations.  Improper installation will result in voiding of warranty. 

 

2.2 CAUTION

 

 

INSTALLATION MUST COMPLY WITH REGULATIONS OF AUTHORITIES HAVING 
JURISDICTION.  

DO

 

NOT

 START THE BURNER UNTIL ALL FITTINGS, COVERS AND 

DOORS ARE IN PLACE.  

DO

 

NOT

 TAMPER WITH THE BOILER OR CONTROLS. 

 

2.3 GENERAL 

INSTRUCTIONS

 

 

Open all boxes, except cabinet or cabinet box.  Check contents against the packing slip.  In 
case of shortages or damage, notify the transportation company immediately. 

 

2.4  PLACEMENT & VENTING

 

 

Installations should conform to CSA Standard B139 or NFPA31 the Installation Code for Oil-
fired Equipment. 

 

FLOOR 

COMBUSTIBLE or NON-COMBUSTIBLE - Support boiler frame 
above damp floor using a Granby Appliance Stand if required.  3/8” 
bolts may be used for leveling (not supplied).  Floor must be strong 
enough to support the weight of the boiler. 

 

CHIMNEY & DRAFT 

Chimney/vent system must satisfy CSA B139, Installation Code.  THE 
BOILER MUST HAVE SUFFICIENT DRAFT AT ALL TIMES TO 
ASSURE SAFE AND PROPER OPERATION.  Not applicable for 
Direct Vent. 

 

TYPE “L” VENT 

Approved for Type “L” vent system.  Maximum flue gas temperature of 
575°F. 

 

Summary of Contents for Comet 145

Page 1: ...THAT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the boiler for future reference CERTIFIED TO CAN CSA Std B140 0 St...

Page 2: ...0 Installation 4 2 1 Important 4 2 2 Caution 4 2 3 General Instructions 4 2 4 Placement Venting 4 2 5 Boiler Configuration 5 2 6 Assemble Boiler 5 2 7 Domestic Hot Water 6 2 8 Assemble Install Burner...

Page 3: ...lation Figure 5 Cleaning Figure 6 Cabinet Assembly Figure 7 Dimensions Figure 8 Exploded Parts Table 1 Parts List Keep this manual in a safe place for future reference Follow manual carefully for the...

Page 4: ...DO NOT ATTEMPT TO START BURNER WHEN EXCESS OIL HAS ACCUMULATED WHEN UNIT IS FULL OF VAPOUR OR COMBUSTION ZONE IS VERY HOT NEVER BURN GARBAGE OR PAPER IN THE UNIT AND NEVER STORE COMBUSTIBLE MATERIAL A...

Page 5: ...ION INSTALLATION MUST COMPLY WITH REGULATIONS OF AUTHORITIES HAVING JURISDICTION DO NOT START THE BURNER UNTIL ALL FITTINGS COVERS AND DOORS ARE IN PLACE DO NOT TAMPER WITH THE BOILER OR CONTROLS 2 3...

Page 6: ...e section 2 8 ASSEMBLE INSTALL BURNER AQUASTAT Honeywell L8124L1029 and White Rogers 8B43A 601 or certified equivalent For remote bulb use Honeywell L8151A1052 The Triple Aquastat can be located on th...

Page 7: ...o correspond with boiler settings table shown on operating decal or section 7 0 BURNER SPECIFICATIONS INSTALL NOZZLE Install selected nozzle and make sure it is tight in the nozzle adapter ELECTRODES...

Page 8: ...nk gauge protectors and outlet protectors are available at your local dealer ONE PIPE SYSTEM Where the tank is above the burner and when the oil flows by gravity to the oil pump a single stage fuel un...

Page 9: ...NER Make sure power and fuel are off CLEAN TUBES Clean the tubes carefully with a 2 fiber bristle brush DO NOT DAMAGE TARGET WALL VACUUM Vacuum out lower burner chamber REPLACE BURNER Check insertion...

Page 10: ...31 CB5 2 1 00 3 79 0 85 60B 7 00 pin 0 118 000 35 CB5 3 1 18 4 47 1 00 60B 7 50 pin 0 140 000 41 Direct Vent BCF V2 0110 10 15 CV3 1 Riello 40 BF3 0 61 3 48 0 50 80B 150 4 10 1 00 74 000 22 CV3 2 0 73...

Page 11: ...ar as possible 5 Insert the threaded tube end into the pierced hole of the flue vent pipe 6 Install the securing nut on the safety switch tube which protrudes into the flue vent pipe Tighten the nut s...

Page 12: ...ue temperature is 575 F DRAFT non Direct Vent only Breech Pressure 0 04 wc CONTROLS AQUASTAT Honeywell L8124L1029 L8124G1020 White Rodgers 8B43A 601 Erie Boss 2400 Series Optional Remote Honeywell L81...

Page 13: ...8 Liters 73 89 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE FOR MOST RECENT UPDATES PLEASE VISIT www GranbyIndustries com The following form MUST be completed for the warranty to be valid Insta...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ...00 COMET 145 10B Pressure Vessel Assembly BCF CB 0110 00 COMET 145 11A Cabinet Top BCA CB 0110 00 COMET 145 11B Cabinet Top BCF CB 0010 00 COMET 145 12 Boiler Jacket 3CC 00 WALL 03 COMET 145 13 Targe...

Reviews: