LF1031-INS-LAB-RevD12
12
LF1041 only: electrical power connections
The control box is the heart of the electrical system.
The battery charger and battery are plugged into the control
box via built-in stacking connectors, depending on battery
charger options.
The hand control pendant and actuator / motor are plugged
into the control box via the lower control box connectors,
shown at right.
When standing behind the patient lift, the hand control
pendant connection is on the far left of the control box.
1. Ensure the marks on the control box and the hand
control pendant plug are aligned, then firmly insert the
hand control pendant plug as shown at top right.
2. Immediately to the right of the hand control pendant
connection is the actuator / motor connection. Insert the
actuator / motor plug firmly in its receptacle (this plug
has nothing to align).
3. Plug the power cord into its connector on the battery
charger as shown at right.
4. Slide the power cord hook onto the battery charger as
shown at right.
5. Snap the power cord hook onto the battery charger as
shown at right.
6. Coil the power cord on the cord hook as shown at right.
7. Before proceeding, ensure that all plugs are seated firmly
in the proper receptacles.
hand control pendant
connector
actuator / motor
connector
hand control
pendant plug
control box
power cord
connector
and plug
battery
charger
power cord
hook
power cord
control box connectors
plug in power cord
attach power cord hook
snap on power cord hook
coil power cord on hook