![Graf EPro Series Installation Instruction Download Page 16](http://html.mh-extra.com/html/graf/epro-series/epro-series_installation-instruction_2253893016.webp)
Insert th
cap
Cut off th
C
.
he hoses fro
he end of the
Connect the
Charging a
Aeration (s
Dischargin
Sludge ret
m the thin s
e hose to rem
hoses at bo
air lifter (red)
stainless stee
ng air lifter (b
urn air lifter (
6
.
Assem
side of the s
move this plu
th ends acco
el)
lack)
(white)
mbly of sw
16 / 25
sealing Pus
of m
ug. Pus
tigh
ording their c
red
blu
bla
wh
witch cabin
sh the hoses
material rema
sh the sealin
htly.
colour code:
d hose
, 13m
ue hose
, 19m
ack hose
, 13
hite hose
, 13
net
s through th
ains stuck in
g cap into th
m
mm
3mm
3mm
e thin top la
n the end of t
he conduit pi
ayer. A plug
he hose.
pe to seal it