1. Scope of delivery
10
/
32
1. Scope of delivery
The GRAF Up sewage treatment plant is available in two versions:
The GRAF UP
one
single-tank-facility without pre-treatment with sludge stabilisation
The GRAF UP
two
two-tank facility with pre-treatment tank and sludge storage
UP
one
UP
two
Scope of delivery:
A container with pre-installed sew-
age treatment technology, com-
prising:
Supply baffle
Clean water lifter
Pre-treatment tank
SBR-tank with
Supply baffle
Clean water lifter
Disc diffusor
Disc diffusor
Pipes and bends for sampling
unit
Tee as drain baffle in the pre-
treatment
Pipes and bends for sampling
unit
HT-pipes DN 50 for sludge
return
EPP-control cabinet with
KL24one control
Air compressor
Step motor valves
EPP-control cabinet with
KL24base control
Air compressor
Step motor valves
Not included are:
Required air hoses: 2 x 19 mm
Required air hoses: 3 x 19 mm