Installation
3A4346C
5
For a better fit with Standard Applicator models, use the following instructions to adjust hose bundles for installation.
Standard Electrostatic
Applicator Models (RxA1x0)
1.
Paint, Dump, and Solvent Tubing (24Z1xx models
only) — Locate two 5/16” tubes labeled “P” and “D”
along with a 1/4” tube labeled “S”. Reduce the
length of the P, D, and S tubes no more than 6” from
its original length. Cut cleanly with a tube cutter to
prevent leaks with the fluid fittings.
2.
Fiber Optic Cable — Use the included cutter tool
(Kit 24W823) to reduce the fiber optic cable length.
Cut the cable to measure 0.110” ± 0.005” (2.8 +
0.12 mm) from the flat end of the hex nut fitting to
the end of the cable (See F
. 2).
3.
Connect the hose bundle. See the installation sec-
tion of ProBell Rotary Applicator manual 334452.
4.
Bring blue wrap up to the back of the applicator
adapter cover and use provided zip ties to secure
wrap.
NOTE: Use a wrench to tighten all fluid fittings from the
ProBell applicator to the hose bundle.
Standard Non-Electrostatic
Applicator Models (RxA1x1)
1.
Unthread the ferrule from the fiber optic cable end
and remove the nut. The parts are not used.
2.
Connect the hose bundle. See the installation sec-
tion of ProBell Rotary Applicator manual 334452.
3.
Bring blue wrap up to the back of the applicator
adapter cover and use provided zip ties to secure
wrap.
N
OTE: Use a wrench to tighten all fluid fittings from the
ProBell applicator to the hose bundle.
NOTICE
T
o prevent damage, do not allow the fiber optic or
power cable to be in tension on the ProBell or controls
end of the hose bundle. Cut air and fluid tubing back if
needed.
F
IG
. 2 Standard Electrostatic Applicator Fiber Optic
Cable Length
F
IG
. 3 Ferrule on Fiber Optic Cable End