
Startup
310802A
7
Startup
1
Place suction tube and drain
tube in grounded metal pail
partially filled with flushing
fluid. Attach ground wire to
pail and to earth ground.
2
Turn prime valve down.
Turn pressure control coun-
terclockwise to lowest pres-
sure.
3
Set pump switch OFF.
3$,17
)/86+
WLD
WLD
WLD
/&&