Installation
Installation
Reference parts illustration on next page.
1. Shutdown system. See operation manual for
shutdown instructions.
2. Remove CAN 2 knockout from electrical
enclosure and install bulkhead fitting (7).
3. Disconnect CAN cable (CAN-1 TCM-H) from
existing bulkhead fitting (F). Leave CAN cable
(CAN-1 MCM) connected to fitting.
4. Attach splitter (2) on new bulk head fitting (7).
Connect CAN cable (CAN-1 TCM-H) and CAN
cable (5) to splitter.
5. Attach CAN cable (5) to bulk head fitting (F).
6. Route CAN cable (8) under fluid manifold.
Connect cable (8) to CAN cable in heated hose
assembly.
Note
Order CAN cables if the heated hose
assembly does not have a CAN cable.
• 24N449 — 50 ft (15.2 m)
• 121006 — 150 ft (45.7 m)
7. Connect CAN cable (3) to heated hose assembly
at the joint before the whip hose and either CAN
port on the remote display module (1). Keep the
remote display module near spray area.
8. Install the protective cap (4) on the unused CAN
port.
Maintenance
Upgrade Software
Order 16M459 for an upgrade token. See Graco
Control Architecture Module Programming manual
3A1244 for instructions.
Replace Tear Off Sheet
1. Peel away the dirty protective sheet.
2. Install a new protective sheet (6) on the display.
6
3A1907C