Kits and Accessories
333586E
85
Communication Gateway Module (CGM) Kits
CGM Kits
Installing a CGM Kit
1. Follow the
2. Verify the power is off to the system.
3. Install the CGM bracket included with the kit to the
ram post bracket with the four 1/4-20 x 0.5 in.
screws included in the kit.
4. Remove the access cover from the CGM (DA).
Loosen and save the two M5-0.8 x 45 mm x screws
(DB), and remove the CGM (DC) from the base
(DD). See F
5. Using the four M4-0.7 x 20 mm mounting screws
included in the kit, mount the base (DD) to the CGM
bracket.
6. Reattach the CGM (DC) onto the base (DD) with the
two screws (DB) that were removed and saved from
step 4.
7. Reattach the access cover (DA).
8. Unplug the cable from the ADM and plug the cable
back into CGM (DC).
9. Plug 3.0 m cable (121003) included in the CGM kit
from the CGM to the ADM.
F
IG
. 65: CGM CAN Connections
Part Number Description
Heat Option
26B169
CGM Kit, EtherNet/IP Heated
26B170
CGM Kit, DeviceNet
Heated
26B171
CGM Kit, PROFINET
Heated
26B172
CGM Kit, PROFIBUS Heated
26B173
CGM Kit, EtherNet/IP Ambient
26B174
CGM Kit, DeviceNet
Ambient
26B175
CGM Kit, PROFINET
Ambient
26B176
CGM Kit, PROFIBUS Ambient
CAN Port 1
CAN Port 2
All electrical wiring must be done by a qualified elec-
trician and comply with all local codes and regulations
F
IG
. 66: Disassembling the CGM
DC
DB
DD
DA
Summary of Contents for 333586E
Page 96: ...Wiring Diagrams 96 333586E Wiring Diagrams...
Page 97: ...Wiring Diagrams 333586E 97...
Page 98: ...Wiring Diagrams 98 333586E...
Page 99: ...Wiring Diagrams 333586E 99...