Setup
3A5202G
7
Setup
Assemble Unit
If unit is already assembled, continue to
.
1. Unfold cart legs and stand cart upright.
2. Install frame safety pins (BA) at front and rear of
cart.
3. Using a two-person lift, place the hopper (A) on top
of the cart frame. Secure the hopper to both sides of
cart using the hopper ring pins (G).
4. Fully insert the material dosing auger shaft (FD) into
the rear end of the hopper (A).
5. Insert mix shaft (FB) into mix tube (FA). Install shaft
and tube onto hopper (A).
a. Align mixing shaft pins (FBB) to slots in the
material dosing auger shaft (FD) and verify that
pins and shaft are fully engaged.
b. Firmly connect mixing tube (FA) to hopper (A).
Secure mixing tube toggle latches (FAA).
6. Lift the motor assembly (C) so that it connects to the
material dosing auger shaft (FD). Immediately
secure the motor to the hopper with the motor
alignment pin (CA). Ensure the pin has slid
completely into place. Slide motor alignment pin
washer (CAB) over the end of the alignment pin
(CA). Secure alignment pin with motor alignment pin
clip (CAA).
7. Engage the rear toggle latch (BB) on the rear cart
leg. Secure with rear toggle latch clip (BBA).
8. Connect motor power cable (CB).
During assembly, the cart could collapse and crush
fingers and other body parts. To avoid possible injury,
make sure all clips and pins are securely in place and
the mixer is on level ground.
Be sure to properly support the mixer with a
two-person lift during transport. Do not suspend from
crane or hoist. The mixer is heavy and can crush
fingers and other body parts.
WLD
&$
&$$
&
&
&$%
WLD
%%
%%$
&
&%
WLD