Install
Install
Install the
the
the Serial
Serial
Serial to
to
to Fiber
Fiber
Fiber Optic
Optic
Optic Converters
Converters
Converters
Every Intelligent Paint Kitchen must have one
Supervisor Box (A) installed in the non-hazardous
location. Each Supervisor Box is shipped with one
serial to fiber optic converter (38) already installed
inside the box.
During installation, serial to fiber optic converters
may need to be installed inside the Supervisor
Box. To install components inside the boxes, see
Mounting and Dismounting to the DIN Rail, page 31
If the number of stations in the paint kitchen exceeds
the number that can be handled, the system can be
expanded. See .
Mounting
Mounting
Mounting and
and
and Dismounting
Dismounting
Dismounting to
to
to the
the
the DIN
DIN
DIN Rail
Rail
Rail
Improper wiring may cause electric shock or other
serious injury if work is not performed properly.
Turn off and disconnect power at the main switch
before servicing or installing equipment.
Disconnect the power before servicing the equipment.
Components located inside the Supervisor Boxes
and Expansion Boxes are to be mounted on a 35 mm
standard DIN rail.
The DIN rail clip on each component is spring-loaded.
No tool is needed to install or remove the
components.
NOTE:
NOTE:
NOTE: Mount each component onto the DIN rail
before
before
before making power or communication connections
to the component.
Figure 27 Mounting Fiber Optic Converter to DIN Rail
The spring must be latched behind the edge of the
DIN rail to connect properly.
To remove a component from the DIN rail, pull down
to compress the spring, pull the bottom out to release
it from the rail, and lift it up off the top of the DIN rail.
Install a clamp end block (6) to hold the components
tightly together on the DIN rail.
3A4030C