background image

308–699

Rev. B

Supercedes Rev. A

First choice when

quality counts.

INSTRUCTIONS-PARTS LIST

INSTRUCTIONS

KEEP FOR REFERENCE.
Read manual 308–611 for important
warnings and instructions.

Road Lazer

Second Color Kit

Model 239–041

GRACO INC.

P.O. BOX 1441

MINNEAPOLIS, MN

55440–1441

COPYRIGHT 1997, GRACO INC.

Graco Inc. is registered to I.S. EN ISO 9001

7534B

Summary of Contents for 239-041

Page 1: ...IONS PARTS LIST INSTRUCTIONS KEEP FOR REFERENCE Read manual 308 611 for important warnings and instructions Road Lazer Second Color Kit Model 239 041 GRACO INC P O BOX 1441 MINNEAPOLIS MN 55440 1441 C...

Page 2: ...ll kit pump A01 by pla cing in open space in pump mount base 413 next to installed pump Attach with four capscrews A24 and four locknuts A15 2 Attach fluid filter assembly A02 to pump nip ple A23 3 Se...

Page 3: ...Installation A A C B OR A B C D D 7535B Fig 1 TWO COLOR ONE COLOR A23 413 A02 A01 A24 A15 Setup for 2 Pump Configuration A38 A04 5 A37 341 A39 A38 REF...

Page 4: ...308 699 4 Installation D A C B A B C D 7536B Fig 2 Setup for 3 Pump Configuration 3 PUMP SYSTEM 5 A37 341 A04 A39 A38 REF A23 413 A02 A01 A24 A15 A38 A04...

Page 5: ...308 699 5 Installation 7537B Fig 3 5 A04 A38 A37 341 Paint Hose Syphon Setup and Routing for 2 or 3 Pump System 2ND PUMP A04 3RD PUMP...

Page 6: ...Installation 7538A PUMP 2 A26 84 A27 PUMP 2 A28 A30 A31 PUMP 3 A26 TO PUMP 2 TO PUMP 3 97 A27 PUMP 3 FROM PUMP 2 OR 3 Hydraulic Components for 2nd or 3rd Pump Installation 91 Fig 4 102 A29...

Page 7: ...308 699 7 Notes...

Page 8: ...1 A12 A33 1 PUMP CONFIG 2 PUMP CONFIG A15 A01 A24 A21 A04 A03 A02 A05 A22 A23 A09 A32 A06 A07 A08 A25 A10 84 A30 A28 A27 A26 A31 REF A29 A31 333 339 341 A13 A34 A35 or A36 A32 REF A39 A38 A37 403 A20...

Page 9: ...A23 235 208 UNION adapter swivel 1 3 8 in npt m x 3 8 in npsm f A24 100 004 CAPSCREW hex hd grade 5 4 3 8 16 unc 2a 1 1 4 in 32 mm long A25 101 566 LOCKNUT nylon 3 8 16 4 A26 113 703 REGULATOR hydraul...

Page 10: ...ections 1 2 Electrical connector J6 to Programmable Skip line Controller 3 3 Solenoid air valves 4 4 A E D B C A B C D E Paint gun P1 Paint gun P2 Bead gun B1 Bead gun B2 12 Vdc Paint Hose Connections...

Page 11: ...From pump 2 From pump 1 From compressor To valve pack From pump 2 or 3 To pump 3 To pump 2 To pump1 To valve pack To proximity sensor To battery post To battery post To cooling fan To engine switch M...

Page 12: ...or consequential damages for lost profits lost sales injury to person or property or any other incidental or consequential loss shall be available Any action for breach of warranty must be brought wi...

Reviews: