Optional Pump Control Module Kit Installation
10
310766E
Optional Pump Control Module Kit Installation
1.
Mount the pump control box (18) near the tandem
bulk pump unloaders. To function correctly the pump
control box must be located within 20 ft of the pump
function module (17). See F
2.
Install the terminal blocks (202) by snapping it into
place in the dinrail of the PrecisionFlo control box.
See F
3.
Wire the cell communication cable to the terminal
block by connecting the four tagged wires (1, 2, 3,
and 4). See F
The length of the Optional Pump Control Cable
(234956) to connect the pump control box and
the pump function module is 20 ft.
F
IG
. 6
202
F
IG
. 7
F
IG
. 8
1
2
3
4